Rinnai EX08DT Installation And Operation Manual page 25

Direct vent wall furnace
Table of Contents

Advertisement

Instructions:
1. Turn off the gas and the power
supply.
2. Remove the 5 screws that hold the
louver assembly and front panel.
Lift the panel straight up and then
remove it.
3. Remove two pressure point screws
(1/8 NPT tap) with 3/16 Allen
wrench. Install two 1/8 in. barb
fittings (field-supplied). Attach the
manometer to both pressure points.
Both pressure points must be used
in order to measure the differential
pressure. Ensure that the
manometer is properly calibrated.
4. Turn on the gas and power supply
to the furnace.
5. Ensure the "Set Back" feature has
been deactivated. ("Set Back"
feature is active by default.)
6. With the unit in the Off position,
press the Test Switch at the top,
right of PC board until it beeps.
7. Select the correct code for gas
type, altitude, and vent length on
the LED display using ▲ and ▼
buttons. Refer to the table below.
Table 8: Gas Pressure

EX08DT Vent Lengths: 0 ft. (0 m) (A1-A4)

EX11DT Vent Lengths:

Short Vent Lengths: 0 - 7 ft. (2 m) + 1 elbow (A1 - A4)

Long Vent Lengths: 7 ft. (2 m) + 1 elbow - 13 ft. (4 m) +
3 elbows (A5 - A8)
Code
A1 / A5
0-2,000 ft
Altitude
0-610 m
EX08DT
Manifold test
0.58 in.
pressure - W.C.
(15 mm)
Low
Manifold test
3.4 in.
pressure - W.C.
(86 mm)
High
EX11DT
Manifold test
0.60 in.
pressure - W.C.
(15 mm)
Low
Manifold test
2.2 in.
pressure - W.C.
(56 mm)
High
EX08DT and EX11DT Installation and Operation Manual
Natural Gas
A2 / A6
A3 / A7
2,001-5,400 ft
5,401-7,800 ft
611-1,646 m
1,647-2,377 m
0.62 in.
0.70 in.
(16 mm)
(18 mm)
3.6 in.
4.1 in.
(92 mm)
(103 mm)
0.64 in.
0.72 in.
(16 mm)
(19 mm)
1.9 in.
1.7 in.
(49 mm)
(44 mm)
Test
Switch
PC
Board
Pressure
Point
(Positive)
Nozzle
Manifold
Pressure
Point
(Negative)
Figure 28

EX08DT Vent Lengths: 0 ft. (0 m) (L1-L4)

EX11DT Vent Lengths:

Short Vent Lengths: 0 - 7 ft. (2 m) + 1 elbow (L1 - L4)

Long Vent Lengths: 7 ft. (2 m) + 1 elbow - 13 ft. (4 m)
+ 3 elbows (L5 - L8)
A4 / A8
L1 / L5
7,801-10,200 ft
0-2,000 ft
2,378-3,109 m
0-610 m
0.78 in.
0.86 in.
(20 mm)
(22 mm)
3.2 in.
5.8 in.
(82 mm)
(147 mm)
0.80 in.
1.06 in.
(20 mm)
(27 mm)
3.8 in.
1.6 in.
(95 mm)
(40 mm)
Propane Gas
L2 / L6
L3 / L7
2,001-5,400 ft
5,401-7,800 ft
611-1,646 m
1,647-2,377 m
0.92 in.
1.04 in.
(24 mm)
(27 mm)
6.2 in.
7.0 in.
(158 mm)
(177 mm)
1.16 in.
1.28 in.
(29 mm)
(33 mm)
3.3 in.
3.0 in.
(84 mm)
(75 mm)
25
L4 / L8
7,801-10,200 ft
2,378-3,109 m
1.16 in.
(29 mm)
5.5 in.
(140 mm)
1.41 in.
(36 mm)
2.7 in.
(69 mm)

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ex11dtRhfe-203ftaRhfe-266fta

Table of Contents