8.9.3.1. Base Unit Test Fixture Reference Drawing
As for TEST fixture, only the switch as shown in a figure is connected to the mass-production set.
Note:
SW : ON (Handset : Nomal)
10m more : No Link
5m less : Link
8.9.4. RF Check Flowchart
Each item (1a ~ 6) of RF Check Flowchart is correspond to
Check Table for RF
Block. Please
refer each item one by one.
44