Dismantling The Insulation, The Gas Inlet Casing And The Nozzle Ring (A175-L And Smaller); Fig. 38: Removing The Insulation (A175-L And Smaller) - ABB HT844414 Operation Manual

Table of Contents

Advertisement

Operation Manual / 4 Product description / A100-L
8 Disassembly and assembly / 8.8 Dismantling the insulation, the gas
inlet casing and the nozzle ring (A175-L and smaller)
8.8
Dismantling the insulation, the gas inlet casing
and the nozzle ring (A175-L and smaller)
Dismantling the insulation
NOTICE
Dry cleaning
The dry cleaning does not have to be removed to dismantle the insulation.
Fig. 38: Removing the insulation (A175-L and smaller).
1. Loosen and remove screws of insulation jackets (51200) from gas outlet casing (61001).
2. Loosen and remove all connecting plates of insulation jackets.
3. Remove insulation jackets.
4. Detach flange connection between gas inlet casing (51001) and bellows.
© Copyright 2018 ABB. All rights reserved.
HZTL4034_EN
Revision N
November 2018

Advertisement

Table of Contents
loading

This manual is also suitable for:

A170-l37

Table of Contents