Summary of Contents for Omicron CIBANO 500

  • Page 1 CIBANO 500 Getting Started...
  • Page 2 The user is responsible for every application that makes use of an OMICRON product. OMICRON translates this manual from the source language English into a number of other languages. Any translation of this manual is done for local requirements, and in the event of a dispute between the English and a non-English version, the English version of this manual shall govern.
  • Page 3: Safety Instructions

    The operator is responsible for the safety requirements during the whole test. Maintenance and repair of CIBANO 500 and its accessories is only permitted by qualified experts at OMICRON service centers except for hardware update options delivered with the relevant Supplementary Sheet.
  • Page 4: Safe Operation

    ► After booting CIBANO 500 either the red or the green warning light on the front panel should be on. If after booting both warning lights are on or off, CIBANO 500 might be defective. In this case, do not use CIBANO 500 and contact your regional OMICRON service center.
  • Page 5 CB MC2 0…300 V DC, 0…240 V AC outputs CB MC2 Test object CB TN3 IOB1 CIBANO 500 Distance: min. 1.5 m/5 ft Height: High-voltage min. 1 m/3.3 ft Safe area test area Figure 1-1: Example of the separation of the safe and high-voltage test areas ►...
  • Page 6: Measurement Setup

    ► Warn people prior any operation to make them aware of any possible disturbances. Orderly measures The CIBANO 500 Getting Started or alternatively the e-book has always to be available on the site where CIBANO 500 is operated. The users of CIBANO 500 must read this manual before operating CIBANO 500 and observe the safety, installation, and operation instructions therein.
  • Page 7: Compliance Statement

    OMICRON test sets are subject to the EU Waste Electrical and Electronic Equipment Directive 2012/19/EU (WEEE directive). As part of our legal obligations under this legislation, OMICRON offers to take back the test set and ensure that it is disposed of by authorized recycling agents.
  • Page 8: System Requirements

    2. For testing with TESTRANO 600, CPC 100 and CIBANO 500. NIC = Network Interface Card.TESTRANO 600, CPC 100 and CIBANO 500 can be connected with RJ-45 connectors either directly to the computer or to the local network, for example, by using an Ethernet hub.
  • Page 9: Designated Use

    Introduction Designated use CIBANO 500, in conjunction with its accessories or as stand-alone unit, is a test system for commissioning and maintenance of circuit breakers. The following tests can be performed using CIBANO 500 according to IEC and ANSI standards: •...
  • Page 10: Front Panel

    Death or severe injury caused by high voltage or current possible ► Do not cover the warning lights (for example, with a computer) since the warning lights indicate possible hazards. ► Always observe the warning lights while working with CIBANO 500. OMICRON...
  • Page 11: Side Panel

    NETWORK For connecting the safety dongles Do not connect. RJ-45 socket for connecting or the 3-Position Remote Safety No functionality CIBANO 500 to the computer Switch implemented. ® Figure 3-2: Side view of CIBANO 500 with the EtherCAT module OMICRON...
  • Page 12 SERIAL NETWORK For connecting the safety dongles Do not connect. RJ-45 socket for connecting or the 3-Position Remote Safety No functionality CIBANO 500 to the computer Switch implemented. Figure 3-3: Side view of CIBANO 500 with the Auxiliary module OMICRON...
  • Page 13: Warning Lights

    3.2.4 Emergency Stop button Pressing the Emergency Stop button immediately shuts off all CIBANO 500 outputs and stops the running measurement. After pressing the Emergency Stop button, Primary Test Manager does not allow starting a measurement. To restart the measurement after the reason for the emergency stop has been resolved, release the Emergency Stop button by carefully turning it, click the Start button in Primary Test Manager, and then press the Measurement Start/Stop button.
  • Page 14 Measurement Start/Stop button on the front panel of the CIBANO 500 test system. After you have performed a test, you can generate exhaustive test reports. Primary Test Manager runs on a computer and communicates with CIBANO 500 through Ethernet interface.
  • Page 15: Installation

    2. Connect the other end of the Ethernet cable to the Ethernet connector of your computer. 3. Check whether the safety dongels shipped with CIBANO 500 are plugged in and locked in the SAFETY connectors on the side panel (see 3.2.2 "Side panel" on page 11).
  • Page 16 CIBANO 500 Getting Started If you could not connect to your CIBANO 500 device and the green light is permanently on, wait a few seconds, and then do one of the following: ► Click More beneath the Connect button, and then click Refresh.
  • Page 17 CIBANO 500 to a test object. You can connect CIBANO 500 to the test object without disconnecting other parts of the station or with complete disconnection from the station as shown in the following figure.
  • Page 18 ► Assure that the points of connection carry no voltage. Voltage on the connection points can impact the safety of the operator but poses no danger to the test set. Clamp CIBANO 500 to the circuit breaker’s trip and close coils without disconnecting other parts of the station. The advantage of this method is that you do not need to modify the wiring of the circuit breaker to the station.
  • Page 19 Installation CB MC2 CB MC2 CB MC2 EXTERNAL Circuit MODULES breaker CIBANO 500 AUX 1 AUX 2 Trip coil Close coil – Figure 4-5: Typical measurement setup for testing high-voltage circuit breakers OMICRON...
  • Page 20 OMICRON Academy – learn more www.omicronenergy.com/academy Learn more about your product in one of the training courses offered by the OMICRON Academy. OMICRON electronics GmbH, Oberes Ried 1, 6833 Klaus, Austria, +43 59495 OMICRON...
  • Page 21 ENU 1007 03 04...