Gang Assembly - HARRISTON INDUSTRIES 2015 Operator's Manual

Table of Contents

Advertisement

3.5

GANG ASSEMBLY

Clamp the tine mounting tubes to the gang
frame with plates, 7/16" X 3 ½" carriage
bolts, lock washers and nuts. Place the 16"
tubes in the front and 12" tubes in the rear
of gang as shown. The two end gangs will
have two tubes as shown. End gangs will
use plates with 4 holes instead of the six
hole plates.
Mount the gang gauge wheel to the gang
frame. Screw the Adjusting crank all the
way down through the gang frame. Place
one ½" flat washer on top of the gauge
wheel bushing, turn the crank until it
protrudes through the bushing enough to
put another ½" Flat washer & the 3/16" x
3/4" roll pin. Adjust to correct height and
lock with Safety Pin. (See diagram below).
Attach the lower linkage to the gang frame
and front mount with linkage pins and ¼" X
½" roll pins. Insert the upper linkage
between the gang uprights and front mount,
securing with bolts and locknuts.
Attach each gang assembly to the toolbar,
using u-bolts, lock washers and nuts to
mount. Center gang assemblies over the
marks on the tool bar.
Mount the Vertical S-Tines to the front tubes
and on chisel cleaner (if equipped). Use C-
shaped clamps, ½" X 4" hex head bolts,
lock washers and nuts. Mount the regular S-
Tines to the middle tubes with L-shaped
clamps, ½" X 4" carriage bolts, lock washers
and nuts. The two end gangs are to have 3
tines and all of the other gangs get 5 tines.
Fasten shovels to tines using bolts supplied
with shovels.
10
Note the two
1/2" flat washers
used in this assembly

Advertisement

Table of Contents
loading

This manual is also suitable for:

2025

Table of Contents