Page 3
We advise having cable ties available to help keep wire mesh in place when you are fitting it. Page 3 of 7...
Page 4
SET UP AS BELOW ILLUSTRATION STEP I – The roof components are to be built first, poles 1, and 1a, make up the sides, with poles 4 and 5 making up the front and back. Lay all roof parts on the floor and connect like below with part 14. Page 4 of 7...
Page 5
STEP II – Inserting legs Lift up one side insert tube No.3, place part no 17 on the end of each leg. STEP III Repeat step II lift up and install the other legs. STEP IV – Create ground frame Install ground tubes as below illustration, once completed the bracing bars(part 7) can be fixed from each leg, see complete picture on page 3 for positioning.
Page 6
STEP IV Install door to main frame as below Illustration. Screw tube 9, 10, 11,12 to the frame, the poles already contain threads to take the screws. Please screw from the top of the frame and from underneath the frame in line with holes on tube 5, screw tube 8 in the same way. STEPVI Link the net as below illustration, and put cover on last.
Page 7
STEPVII Roof support bar installation as below illustrations. CONSTRUCTION WARNING – MUST BE FOLLOWED TO AVOID DAMAMGE WHEN USING THE OUTDOOR COVERS. Because of the flat roof the wire mesh must be pulled as tightly as possible across the top and secured around the top edge with cable ties.