Page 3
STEP I - Lay all roof parts (1, 5, 6 and 7) flat on the floor and connect like below with part 21, 22, 23, 24. Page 3 of 6...
Page 4
STEP II – Inserting legs Lift up one side insert tube No.3 and No.4, leg 4 at both ends, leg 3 in the middle. STEP III Repeat step II lift up and install the other legs. STEP IV Create ground frame Page 4 of 6...
Page 5
STEP V Assemble the door frame like the diagram, secure the corners of the door frame using the door cable set. Pull the door cover onto the door frame and seal it with the velcro. STEP VI Attach the door lock. Make a small hole through the fitted door cover to match the hole that is pre drilled on the door (Tube No.15), make it small enough so just a screw can fit through.
Page 6
STEPVIII Pull the greenhouse cover over the main frame and secure the cover to the frame by using the Velcro STEPIX Side water collector. Use and adjust the buckle ties on the waterspout fabric to make it gather water when is needed.