Page 3
We advise having cable ties available to help keep wire mesh in place when you are fitting it. Page 3 of 6...
Page 4
SET UP AS BELOW ILLUSTRATION STEP I – The roof components are to be built first, poles 4 make up the sloped sides running front to back, with poles 5 and 5a making up the central, flat horizontal row, poles 1 run from front to back like below diagram.
Page 5
– STEP II Inserting legs Lift up one side insert tube No.3 and No.3a, leg 3 at both ends, leg 3a in the middle. STEP III Repeat step II lift up and install the other legs. STEP IV – Create ground frame Install ground tubes as below illustration –...
Page 6
STEP IV Install door to main frame as below Illustration. Screw tube 9, 10, 11,12 to the frame, the poles already contain threads to take the screws. Please screw from the top of the frame and from underneath the frame in line with holes on tube 5, screw tube 8 in the same way. STEPVI Link the net as below illustration, and put cover on at last.
Page 7
CONSTRUCTION WARNING – MUST BE FOLLOWED TO AVOID DAMAMGE WHEN USING THE OUTDOOR COVERS. Because of the flat roof the wire mesh must be pulled as tightly as possible across the top and secured around the top edge with cable ties. This will stop any ‘give’ in the mesh and stop water building up on the cover which may cause damage to the cover or supporting poles.
Need help?
Do you have a question about the CAGE 6M and is the answer not in the manual?