Page 4
SET UP AS BELOW ILLUSTRATION STEP I - Lay all roof parts (1, 4, 5 and 5a) flat on the floor and connect like below with part 20 and 21 The curved part 10 can now also be fitted, Once these are in place the central spine (part 11 and 12 can be bolted into place, 12 is the last bar in the spine please refer to diagram below carefully, here use screw M6X45) Page 4 of 7...
Page 5
STEP II – Inserting legs Lift up one side insert tube No.3 and No.3a, leg 3 at both ends, leg 3a in the middle. STEP III Repeat step II lift up and install the other legs. STEP IV – Create ground frame Page 5 of 7...
Page 6
STEP V Assemble the door frame like the diagram, secure the corners of the door frame using the door cable set. Pull the door cover onto the door frame and seal it with the velcro. STEP VI Attach the door lock. Make a small hole through the fitted door cover to match the hole that is pre drilled on the door (Tube No.18), make it small enough so just a screw can fit through.
Page 7
STEPVIII Pull the greenhouse cover over the main frame and secure the cover to the frame by using the Velcro STEPIX Side water collector. Use and adjust the buckle ties on the waterspout fabric to make it gather water when is needed. Page 7 of 7...