avenli RF-21-CZ2 User Manual page 12

Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 1
STEP 3. INSTALLATION OF THE HORIZONTAL SUPPORT
TYPE A
TYPE B
STEP 4. INSTALLATION OF THE T-JOINT (FOR TYPE A)
belt
STEP 5. INSTALLATION OF THE T-JOINT (FOR TYPE B)
belt
1.
Connect the connecting end of the T-joint
to the downstream horizontal pipes.
2.
Insert the pin firmly into the hole of the
connected horizontal pipe and T-joint.
3.
Place the cap on the upright.
4.
Insert the vertical rack into the T-joint
through the belt.
5.
Insert the pin into the hole of the T-
joint and the vertical upright.
TIP: If you can't find the hole on a horizontal
pipe or vertical standpipe, rotate the pipes until
the pin meets the hole.
1)
Connect the connecting end of the T-joint
to the downstream horizontal pipes.
2)
Insert the pin firmly into the hole of the
connected horizontal pipe and T-joint.
3)
Place the cap on the upright.
4)
Insert the vertical rack into the T-joint
through the belt.
TIP: If you can't find the hole on a horizontal
pipe or vertical standpipe, rotate the pipes until
the pin meets the hole.
12

Advertisement

Table of Contents
loading

Table of Contents