Completing The Configuration - HP ProLiant xw25p User Manual

Server blade
Hide thumbs Also See for ProLiant xw25p:
Table of Contents

Advertisement

2. Install the server blade. When the server blade is fully inserted, it locks into
place.
The default setting for server blades initiates automatic power up.

Completing the Configuration

To complete the server blade and HP BladeSystem configuration, refer to the
hardware installation and configuration poster that ships with the server blade
enclosure.
CAUTION: To prevent improper cooling and thermal damage,
do not operate the server blade enclosure unless all bays are populated
with either a component or a blank.
NOTE: The first server blade must be installed into a server blade
enclosure to facilitate naming the server blade enclosure, the rack, and
the interconnects. Complete the system configuration before installing
additional server blades.
Setup
23

Advertisement

Table of Contents
loading

This manual is also suitable for:

Proliant bl25p

Table of Contents