Arrangement On The Top-Hat Rail - Viessmann WAGO 750-8212/000-100 Installation And Service Instructions For Contractors

Bms communication with heating systems via bacnet, bacnet/ip gateway
Table of Contents

Advertisement

Installation sequence
Installing the gateway and power supply unit
Overview of connecting cables
Connecting cables
Standard delivery:
Cable cores between gateway and power supply unit
Accessories:
CAN bus cable
On site:
Recommended power cable

Arrangement on the top-hat rail

With sub-distribution boards, mount both devices on a
lower top-hat rail.
WAGO BACnet/IP gateway
Fig. 2
10
(cont.)
Length
0.52 m
7 m
3-core:
H05VV-F3G 1.5 mm
2
2
H05RN-F3G 1.5 mm