Download Print this page

Sealey AP1210 Instructions page 2

Steel workbenches with wooden top

Advertisement

5. ASSEMBLY
5.1.
Assemble leg supports (fig.1.1) with short cross rail members (fig.1.2, fig.1.3) .
5.2.
Assemble end frames with long cross rail members (fig.1.4)
NOTE: Ensure full engagement of all members fixings to ensure sound, stable structure.
AP1210
ENVIRONMENT PROTECTION
Recycle unwanted materials instead of disposing of them as waste. All tools, accessories and packaging should be sorted, taken to
a recycling centre and disposed of in a manner which is compatible with the environment. When the product becomes completely
unserviceable and requires disposal, drain any fluids (if applicable) into approved containers and dispose of the product and fluids
according to local regulations.
Note: It is our policy to continually improve products and as such we reserve the right to alter data, specifications and component parts without prior
notice.
Important: No Liability is accepted for incorrect use of this product.
Warranty: Guarantee is 12 months from purchase date, proof of which is required for any claim.
Sealey Group, Kempson Way, Suffolk Business Park, Bury St Edmunds, Suffolk. IP32 7AR
01284 757500
© Jack Sealey Limited
fig.1
01284 703534
Original Language Version
sales@sealey.co.uk
AP1210, AP1535 Issue 2 (F,5) 11/09/20
AP1535
www.sealey.co.uk

Advertisement

loading

This manual is also suitable for:

Ap1535