Soluna 6K Pack HV L-E User Manual

Lithium battery pack

Advertisement

Quick Links

User Manual
Lithium Battery Pack
Soluna 6K Pack HV (L-E)
May.2022 Revision A.0
1 / 23

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the 6K Pack HV L-E and is the answer not in the manual?

Questions and answers

Summary of Contents for Soluna 6K Pack HV L-E

  • Page 1 User Manual Lithium Battery Pack Soluna 6K Pack HV (L-E) May.2022 Revision A.0 1 / 23...
  • Page 2 About this manual This manual describes how to install the of Soluna 6K Pack HV (L-E). Reading this manual before you attempt to install the product, and follow the instructions throughout the installation process. If you are uncertain about any of the requirements, recommendations, or safety procedures described in this manual, contact Soluna immediately for advicing and clarification.
  • Page 3: Table Of Contents

    3.7 Safety gear ......................19 3.8 Wiring specification ................... 19 3.9 Wi-Fi module connection ................... 20 4 How to operate Soluna 6K Pack HV (L-E) ............21 5 Electrical connection .................... 22 5.1 Single battery unit ....................22 5.2 The battery units are connected in parallel ............22 6 DOD setting of Inverter ..................
  • Page 4: Safety Precautions

    1 Safety precautions 1.1 Warning Sign Warning signs are used to warn you about the conditions that may cause severe injury or damage to the device. They instruct you to exercise caution to prevent danger. The following table describes the warning signs used in this manual. Sign Description This battery pack contains high voltage which can cause electric shock...
  • Page 5: Risks Of Explosion

    General safety precautions Failure to observe the precautions described in this section can cause serious injury to persons or damage to property, observe the following precautions. 1.2.1 Risks of explosion ● Do not subject the battery pack to strong impacts. ●...
  • Page 6: Response To Emergency Situations

    ● Do not use cleaning solvents to clean the battery pack. 1.4 Response to emergency situations The Soluna 6K Pack HV (L-E) battery pack comprises multiple batteries that are designed to prevent hazards resulting from failures. However, Soluna cannot guarantee their absolute safety.
  • Page 7: Wet Batteries

    If the battery pack seems to be damaged, pack it in its original container, and then return it to Soluna or your distributor. Damaged batteries may leak electrolyte or produce flammable gas. If you suspect such damage, immediately contact Soluna for advice and information. 1.5 Qualified installers This manual and the tasks and procedures described herein are intended for use by skilled workers only.
  • Page 8: Product Introduction

    2 Product Introduction Soluna 6K Pack HV (L-E) is an LFP lithium battery product with BMS (battery management system). It is a high-voltage battery module with CAN communication, under-voltage,over-voltage,over-current,over-temperature,under-temperature protection functions. It has the characteristics of high energy density, long life, safety and reliability and so on, and It is your trustworthy green environmental product.
  • Page 9: Outline Dimension

    2.3 Outline Dimension Figure 2.1 outline dimension Width Depth Height Weight 9 / 23...
  • Page 10: Technical Data

    2.4 Technical data Physical Characteristics Width 654mm Depth 227mm Height 971mm Weight 66kg Electrical Characteristics Battery type Total Energy Capacity 6kWh Usable Energy Capacity 5.4kWh Battery Capacity (Nominal) 40Ah Voltage Range(Usable) 134.4~168V Nominal Voltage 156V Charge voltage (CV) 168V Discharge cut-off voltage 134.4V Charge/Discharge Current (Nominal) 20A/20A...
  • Page 11 Humidity 5%~95% Altitude Max. 2,000 m Cooling Strategy Natural Convection Reliability & Certification Cell:UL1642 Certificates Battery Module:IEC62619 & UL1973 Transportation UN38.3 Ingress Rating IP54 Warranty Please refer to SOLUNA WARRANTY CONDITIONS 11 / 23...
  • Page 12: Appearance

    2.5 Appearance ⑦ ② ① ③ ⑧ ④ ⑤ ⑥ Figure 2.2 Appearance Number Name Remark ① Cable entry ② Power ON/OFF ③④ Handle ⑤⑥ Grounding ⑦ Power light ⑧ Fixed bracket 12 / 23...
  • Page 13: Wring Port

    2.6 Wring port User can see the wiring port of Soluna 6K Pack HV (L-E) after the cover cap opened, please see the below picture in details. Details ② ① ④ ③ Figure 2.3 wiring port Number Name Remark ①...
  • Page 14: Can Communication Interface Definition (Can1 & Can2)

    2.7 CAN communication interface definition (CAN1 & CAN2) Figure 2.4 CAN interface definition 2.7.1 CAN1 port (for inverter communication) — — — — — CAN1H CAN1L 2.7.1 CAN2 port (for battery communication) 485A 485B CAN1H CAN1L +12V CAN2H CAN2L 14 / 23...
  • Page 15: Installation

    ② 3.1Unpacking the package 3.1.1 Please see the below figure for the packing box of Soluna 6K Pack HV (L-E). 3.1.2 Remove the nails from the wooden case with a claw hammer, And open the wooden case, then, remove the wooden board .
  • Page 16: Packing Lists

    3.1.5 Keep the carton for future storage or transportation 3.2 Packing lists The following table lists the numbers of each item included. If anything is damaged or missing, contact Soluna or your distributor. Item Name Remark...
  • Page 17 ● The ambient temperature is between 15 and 30° C. ● The temperature and humidity stays at a constant level. ● There is minimal dust and dirt in the area. ● There are no corrosive gases present, including ammonia and acid vapor. If the ambient temperature is outside the operating range, the battery pack stops operating to protect itself.
  • Page 18: Installation Requirement

    3.6 Installation requirement Soluna 6K Pack HV (L-E) hould be installed against the wall, Eight holes should be drilled on the wall in order to fix the racks of the battery module. Please find the following pictures for details. 18 / 23...
  • Page 19: Safety Gear

    Insulated gloves Safety goggles Safety shoes 3.8 Wiring specification In order to standardize the wiring specification of Soluna 6K Pack HV (L-E), the following requirements are required for connecting wires of Soluna 6K Pack HV (L-E). Battery cable Communication cable...
  • Page 20: Wi-Fi Module Connection

    3.9 Wi-Fi module connection 3.9.1 Single battery unit Wi-Fi module should be connected to the CAN2 port of battery with Wi-Fi cable, user can find the Wi-Fi cable in the packing box, Please find the following position of Wi-Fi module for details. Wi-Fi installation position 3.9.2 The battery units are connected in parallel User only need to install 1 unit Wi-Fi module on the HV parallel box, Please...
  • Page 21: How To Operate Soluna 6K Pack Hv (L-E)

    Step: please see below information for details. 1)Connect the inverter and battery module with communication & battery cable 2) Turn on the breaker , the breaker is on the right side of Soluna 6K Pack HV (L-E). Please see below figure for details. Details...
  • Page 22: Electrical Connection

    5 Electrical connection 5.1 Single battery unit 5.2 The battery units are connected in parallel 22 / 23...
  • Page 23: Dod Setting Of Inverter

    To make sure the battery working smoothly, we recommend the DOD setting of inverter as follows. On-grid DOD:80% Off-grid DOD:70% 7 Contact us If any questions for Soluna, please contact us. SOLUNA Add: No.3492 Jinqian Road, Shanghai, China 201406 Tel: +86-21-57475835 Email: sales@solunabattery.com Web: www.solunabattery.com...

Table of Contents