Page 3
WARNING AVERTISSEMENT ALWAYS FOLLOW SAFETY PRECAUTIONS RESPECTEZ TOUJOURS LES CONSIGNES DE SÉCURITÉ Death or serious injury may occur when children climb on audio and/or video equipment furniture. A remote control or toys placed on the furnishing may encourage a child to climb on the furnishing and as a result the furnishing may tip over on to the child.
Page 4
Secure the cabinet Only Adults should to avoid fall down. move the cabinet. L’armoire ne doit être Sécurisez l’armoire pour déplacé QUE PAR DES éviterqu’elle soit tombée. ADULTES. Poussée Push Never climb, sit or stand on the cabinet. Personne ne doit s'asseoi r, se tenir ou grimper sur armoire.
Page 5
CAUTION DO NOT allow anyone to sit, stand or climb on the station. DO NOT lift the station. DO NOT block the ventilation holes used for air circulation. DO NOT overload objects on the station shelves. (shelf maximum loading = 38.1kg / 84lbs).
CONTENTS Contact Information ....................5 Package Contents ....................1 Tools Required ......................2 Dimensions ......................3 Diagram ........................3 Front and Back ..................... 3 Sides ........................4 Top and Bottom ..................... 4 Installation ....................... 5 Step 1: Install door lock cover (Optional) .............. 6 Step 2: Connect the power strip to a wall outlet ...........
(folded) User Manual Door lock cover x 1 Flat head screw x 11 Snap rivet x 8 (M4x5L) (Unfolded) Umbrella head screw x 4 Concrete anchor x 6 E12 Station (M4 x 5L) ...
Sides Top and Bottom Front and Back Sides Top and Bottom 6. Power cable hole 13. Ventilation holes 1. Top cover 7. Ventilation holes 2. Finger pull 8. Handle 3. Door lock 4. Foot rubber 9. Fix Plate holes 5.
Installation Please check that you have taken out all package contents out and the numbers of each item is correct before getting started. Parts list Charging station Chassis Adapter drawer Door lock cover Top cover Divider x 13 Snap rivet x 8 Flat head screw x 11 Umbrella head screw x 4 Desk mount (optional)
Before installing the charging station 1. Be sure to reserve enough space for installation. It is recommended to reserve at least 47.2”(W)* 35.42”(D) inches. 2. It is recommended to allocate 2 people for efficient assembly. Step 1: Install door lock cover (Optional) First, attach the door lock cover hole on the nut column, and then install the door lock cover using 2 umbrella head screws into the adapter drawer.
Step 2: Connect the power strip to a wall outlet 1. Remove the packing material of the power strip. 2. Feed the power strip through the hole provided. 3. Connect the power strip to a wall outlet. [Note] Set the power socket to the OFF position before plugging the charging station to wall outlet.
Please place the power adapter onto the adapter drawer in order, don’t stack the adapters. For some device adapters that are not compatible with the power strip (EX: e.g. iPad 8, iPad Air 4th generation), please contact AVer for help. 8 ...
Step 4: Extend and fix the sides of the chassis Extend the sides of the chassis out at right angles. Insert 2 x flat head screws and 2 x snap rivets through the hole located on the corners of the rear plate. Each corner has one on the top and one on the bottom (4 screws / snap rivets total).
Step 5: Insert dividers into the slots on the shelf Insert 13 x dividers into the slots on the shelf. Ensure that all dividers are properly seated. 10 ...
Step 6: Cable management 1. Determine the length of power cable that is needed to reach from the hole located on the back of adapter drawer to the devices. 2. Route the adapter DC-end cable. Along with the V-shape routing groove. 3.
Step 7: Install top cover (Optional) Place the top cover on the top of both sides. Use 4 x snap rivets on the two outer holes on both sides to prevent removal. [Note] If you insert the snap rivet into the wrong hole, it is recommended to remove it with a scissor and then reinstall with a new snap rivet.
Desk mount (Optional) 1. Remove the pre-installed screws on the top of cable grommet on each side (See the figure as below for exact locations). 2. Determine the appropriate L- shaped mounting bracket location and fix 2 x L- shaped mounting bracket with screws. 3.
Troubleshooting Q: Why are all of my devices plugged in but not charging? A: 1. Make sure power cords are undamaged. 2. Make sure power cords are firmly inserted into the available socket with stable current. 3. Make sure the power plug and current consumption are compliant with your country specification standards.
Specifications Model Capacity Mobile devices up to 15.6" Supported Devices Charging Type Fully Charging Power Specification Power Strip: 100-120V ~ 50/60Hz, 12A Door Lock cover: 2 points mechanism with key Security lock function. Fixed Shelf Shelf Support 38.1 kg (84lbs) Weight(ea.) Adapter Shelves(ea.) 6.35 kg (14lbs)
Specifications are subject to change without prior notice. Service and Warranty All of our products come with a quality and safety assurance. For customers located in North America, please visit the AVer USA support site for comprehensive RMA, Warranty, and Service information: https://averusa.com/classroom-technology/support/ For customers located outside North America, please visit AVer Global support site: https://www.aver.com/...
Appendix – Earthing [Caution] High touch current, Connect to earth before connecting to supply. (Yellow/Green wire min. 14AWG) [Note] Installation of the protective earthing connection of the socket-outlet by a skilled person. [Attention] Contact à courant élevé, Reliez l’appareil à la terre avant de la connexion à l’alimentation en courant. (Câble jaune/vert min.
Need help?
Do you have a question about the E12 and is the answer not in the manual?
Questions and answers