Page 2
LIMITATIONS OF LIABILITY AND INDEMNITY IN NO CASE, WHETHER AS A RESULT OF A BREACH OF CONTRACT, BREACH OF WAR- RANTY OR TORT (INCLUDING STERIS'S OR CUSTOMER'S WILLFUL ACTS OR NEGLIGENCE OR STRICT LIABILITY) SHALL STERIS OR CUSTOMER BE LIABLE TO THE OTHER FOR ANY CONSEQUENTIAL OR INCIDENTAL DAMAGES INCURRED BY THE OTHER, INCLUDING, BUT NOT LIMITED TO, LOSS OF REVENUE, PROFITS OR GOODWILL.
Page 3
A WORD FROM STERIS CORPORATION Follow each step of the uncrating/installation instructions in the order presented. Open the carton carefully to avoid damage to the equipment inside. If you find any indication of damage to the equipment (no matter how slight), show it to your supervisor. To properly install this unit, you will need the Equipment Drawings (previously furnished), showing all utility service and space re- quirements.
TABLE OF CONTENTS SECTION SECTION SECTION TITLE TITLE TITLE PAGE PAGE PAGE SECTION SECTION TITLE TITLE PAGE PAGE SUMMARY OF WARNINGS AND CAUTIONS ..1 UNCRATING INSTRUCTIONS ......3 Open Carton ..............3 Move Washer and Remove Skid ........4 Prepare Washer for Installation .........
SUMMARY OF WARNINGS AND CAUTIONS The following is a summary of the safety precautions which must be observed when uncrating, installing and operating this equipment. WARNINGS indicate the potential for danger to personnel and CAUTIONS indicate the potential for damage to equipment. These precautions are repeated (in whole or in part), where applicable, throughout the instructions.
UNCRATING INSTRUCTIONS NOTE: Washer weighs approximately 800 lbs (363 kg). Use a Open Carton forklift to move the unit. NOTE: Uncrate on level floor as close to installation site as possible. 1. Position unit to open cardboard carton from the top. Provide a WARNING - PERSONAL INJURY clear work area on all sides.
1. With washer still mounted on skid, use a forklift to move washer Move Washer and to installation site. Remove Skid 2. Remove four lag bolts securing washer base to the skid. 3. Remove and discard skid from under washer. If necessary, use WARNING - PERSONAL INJURY a piece of plywood as a small ramp to slide washer from skid to AND/OR EQUIPMENT DAMAGE...
INSTALLATION INSTRUCTIONS 1. Review installation requirements: Before Installing a. Clearance - Clearance space shown on Equipment Drawing is Equipment necessary for easy installation and proper operation and maintenance of washer. b. Barrier wall flange(s) installation - Refer to Equipment Draw- ing for barrier wall installation.
• COLD WATER (required only if equipped with Drain Discharge V e n t Cooldown and Cold Water Pre-wash option) - Connect line to washer connection, accessible from lower service com- partment. P u r e • STEAM (required on Steam Heated units only) - Connect line W a t e r to washer connection, accessible from lower service compartment.
INSTALLATION CHECKLIST Installation checklist must be completed after the washer is in- stalled and prior to performing the operational test to assure complete and correct installation. NOTE: Contact your STERIS sales representative to demonstrate proper equipment operation and schedule a technician to test your installation.
Page 12
OPERATIONAL TEST Test procedures included in this section should be performed by a qualified service technician prior to normal operation of the washer. 1. Open chamber door. Check that debris screen is positioned in wash chamber sump. 2. Check that wash chamber is empty and all packing material (tape and nylon straps) has been removed.
8. Press Cycle/Start touch pad a second time to start the selected (LIGHT) cycle. NOTE: If Cycle/Start is not pressed a second time while the selected cycle name is displayed, screen automatically returns to the cycle menu. CAUTION: Once three-phase 9.
Page 14
20. Verify alarm buzzer sounds and the following operator instruction appears on display screen once cycle is complete. STATUS PLEASE OPEN DOOR AND REMOVE LOAD 21. Open chamber door and allow chamber and accessories to cool before unloading. Verify display screen returns to the first cycle menu once door is opened.
Page 16
Protect your STERIS equipment with cost-effective extended service agreements The best way to prevent costly downtime due to equipment malfunction is with regularly scheduled maintenance performed by qualified technicians trained in the latest technology. STERIS offers annual maintenance agreements to give your capital equipment planned maintenance that will help correct little problems before they become big ones.
Need help?
Do you have a question about the RELIANCE 300 and is the answer not in the manual?
Questions and answers