Gigabyte E152-ZE1 User Manual page 27

1u short depth amd epyc 7003 series server system
Table of Contents

Advertisement

4
5
7
1 1
• When installing the heat sink over the CPU, use T30-Lobe driver to tighten the 4 captive nuts in
sequential order (1g2g3g4).
• The screw tightening torque: 8 ± 0.5kgf-cm (17.0± 1.0 lbf-in)
2 2
3 3
2 2
System Hardware Installation
- 27 -
4 4
2 2
3 3
1 1
4 4
6
1 1
9
3 3
8

Advertisement

Table of Contents
loading

Table of Contents