Dometic MT NU 3600 Installation And Operating Manual page 14

Advanced mains priority switch with controllable output
Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 1
Installation
Wiring diagram
N
PE
L
COM
NO
NC
!
WARNING! Electrocution hazard
No connection between PE and N at output AC-OUT or AC-OUT2 is allowed.
!
WARNING! Electrocution hazard
Follow prescribed standards and guidelines depending on the installation situation.
The appropriate protective device must be used. When used with a residual-current
device (RCD), N and PE must be short-circuited at the 230 V output of the inverter.
➤ Make sure that the inverter applied is equipped with a safety isolation (galvanic isolation)
between input (battery voltage) and AC output (230 VAC).
Connected cabling must have sufficient cross-section to avoid damage caused by overheating or
fire.
➤ Check cables for damage after installation and secure against tensile stress with suitable
counter-measures.
8.3
Connect battery monitor
To connect a battery monitor that can activate AC-OUT2 depending on battery level as described in
chapter chapter "Switch output" on page 12, connect as follows:
1. Connect +12V to the NO terminal.
2. Connect the Switch-signal of the battery monitor to the NC terminal.
3. Use COM as input signal and connect to +12V at ON Out2 and minus to ground.
8.4
Connect switching signal 12 V
To connect a lamp that indicates mains input as described in chapter "Switching signal 12 V" on
page 13, connect as follows:
➤ Wire the lamp connected +12 V to the NO terminal and ground to the COM contact.
14
Description
Neutral conductor
Protective earth conductor
Line conductor
Common terminal
Normally open terminal
Normally closed terminal
NU 3600
EN

Advertisement

Table of Contents
loading

Table of Contents