Packing And Shipping The Switch 4500 - 3Com ProCurve E4500-48 Getting Started Manual

Switch 4500 family
Table of Contents

Advertisement

36
C
2: I
HAPTER
NSTALLING THE
Packing and
Shipping the Switch
4500
S
WITCH
This section describes how to correctly package your Switch 4500 should
you need to return the Switch to 3Com.
WARNING: The unit should be packaged safely to ensure that you do
not invalidate the repair.
Follow these steps to ensure that you package your unit correctly:
1 Orientate your Switch so that the back panel is on the left side (looking
down at the top of the unit) as shown in Figure 9.
2 Secure one of the polystyrene supports to the back panel side of the unit.
Secure the other support to the front panel side of the unit.
3 Place the unit in the box with the back panel next to the cable packaging.
Figure 9 Correct Orientation When Packing the Switch 4500
Cable Packaging
Back
Panel Side
of Unit
Polystyrene Supports
3Com Switch Unit
Front
Panel Side
of Unit

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the ProCurve E4500-48 and is the answer not in the manual?

Questions and answers

This manual is also suitable for:

4500 26-port4500 50-portSwitch 4500 pwr 26-port

Table of Contents