Installation; Unpacking And Inspection; Preparation; Mounting The Unit - SCC MPPT 3KW User Manual

Solar charge controller 3kw
Table of Contents

Advertisement

3. INSTALLATION

3.1 Unpacking and Inspection

Before installation, please inspect the unit. Be sure that nothing inside the package is
damaged. You should have received the following items inside of package:
 Solar charge controller x 1
 User manual x 1
 Communication cable x 1

3.2 Preparation

Before connecting all wirings, please take off wiring box cover by removing screws as
shown below.

3.3 Mounting the Unit

Consider the following points before selecting where to install:
This solar charge controller is designed in IP31 for indoor applications only.
Do not mount the unit on flammable construction materials.
Mount on a solid surface
Install this charger at eye level in order to allow the LCD display to be read at all
times.
For proper air circulation to dissipate heat, allow a
clearance of approx. 20 cm to the side and approx. 50 cm
above and below the unit.
The ambient temperature should be between 0°C and 55°C
to ensure optimal operation.
The recommended installation position is to be adhered to
the wall vertically.
6

Advertisement

Table of Contents
loading

Related Products for SCC MPPT 3KW

This manual is also suitable for:

Sscc-mppt-3kw

Table of Contents