Download Print this page

Monte Carlo Fan Company 5HM52 Series Owner's Manual And Installation Manual page 5

Advertisement

18
Place the canopy over the yoke screws
aligning the large holes from the canopy
over the remaining screws of the yoke.
Reinstall the screws previously removed.
21
Safety cable installation
Safety Cable
Lag Screw
safety
cable
washer
lock
3" lag
washer
screw
For Canadian installation and for USA fan and light
kit combinations over 35 lbs, in both flush and
downrod modes the safety cable must be installed
into the house structure beams using 3" lag
screws, washers and lock washers provided. Make
sure that when the safety cable is fully extended
the lead wires are longer than the cable and no
stress is placed on the lead wires.
Note:If Installing The Secondary Support Safety
Cable in the U.S., Do Not Remove Knockouts In
The Outlet Box.
24
Lift fan to mounting bracket, aligning the "L"
shape holes with the scresws on the mount-
ing bracket. Turn the fan clockwise to lock
in position. Install the 2 canopy mounting
bracket screws from the hardware pack and
tighten securely.
© 2013 Monte Carlo Fan Company
19
Install 2 of the screws to the side panel
corresponding to the open slotted holes
on the canopy upper rim. Remove the all
thread studs from the lower part of the
mounting bracket.
22
House
Black
White
Ground
Connect black and blue wire from fan to Black or (Hot)
wire from house. Connect White wire from Fan to White
(Neutral) wire from house. Connect Ground leads from
mounting bracket and downrod to Ground lead from
house. Refer to Safety Tips section of manual.
25
Place blade holders onto blades aligning holes
in blade holder with holes in blade. Make sure
that the side of the blade you select is facing
downward. Install 3 screws and fiber washers
to back side of blade as shown. Tighten
screws securely. Repeat this process 4 more
times until all blades are assembled.
5
20
Hang fan from mounting bracket by
the hands free hook into a closed
hole on the edge of the Canopy.
23
Fan
Blue
Black
White
Green
Make wire connections to power source using wire nuts
provided. Make sure that no filiments are outside of
the wirenut. After making the wire connections, the
wires should be spread apart with the grounded con-
ductor and the equipment-grounding conductor on one
side of the outlet box and ungrounded conductor on the
other side of the outlet box.
26
Install blades to motor using the 10
motor screws provided. Tighten screws
securely. Setting the reverse switch in
the down position will result in down-
ward airflow and setting the switch in
the up position will result in upward
airflow.
Hands free hook
Reverse
switch
7/15/2013

Advertisement

loading

This manual is also suitable for:

5hm52bs