Wall Mounting - BandLuxe E500 Series User Manual

Lte outdoor cpe
Table of Contents

Advertisement

LTE Outdoor CPE
Before installing the CPE, consider the ambient temperature, device weight,
antenna clearance, and device orientation on wall/pole for proper installation.
1. Choose a hard and stable wall or pole to mount the CPE.
2. The ambient temperature must be within -40°C to 55°C.
3. Mount on a wall or pole that can sustain the weight of the CPE.
4. Mount upright on a wall or pole that has a clear view of the signal source.

Wall Mounting

1. Align the mounting bracket on the wall. Using the bracket as mounting
template, mark the positions to drill the holes.
2. Assemble the bracket as shown in the illustration.
3. Attach the bracket to the back of the
CPE.
4. Hang the CPE to the wall and secure the
bracket using the designated screws
and washers.
 
 
 
 
EN-8

Advertisement

Table of Contents
loading

This manual is also suitable for:

E503E504E507E512E513E520 ... Show all

Table of Contents