LG Tri-Zone Multi F Installation Manual page 58

Outdoor unit, multi-zone heat pump systems 1.5 to 5 tons
Table of Contents

Advertisement

WIRING
Power Wiring and Communications Cable Connections
1. Connect power wiring / communications cable (connecting cable) from the outdoor unit to the individual indoor unit terminals following the
wiring diagrams on the outdoor unit and indoor unit control covers.
2. Ensure that the terminal board numbers (A, B, C; 1, 2, 3) and wiring color on the outdoor unit matches the terminal number and wiring
color on the indoor unit. (Terminal board numbers are arranged from top to bottom in order from 1 to 3.)
3. Provide strain relief by securing the wiring / cable to the indoor unit with the factory-supplied clamps.
4. For more installation information for specific indoor units, refer to the separate indoor unit installation manuals on www.lg-dfs.com.
Distributor (BD) Unit (Multi F MAX Systems Only)
General Instructions
• Always connect power wiring / communications cable matching
the BD unit terminals to their respective indoor units (Example for
three-port BD Unit PMBD3630: A, B, and C).
• Follow the instructions on the nameplates and connect wiring /
cables of the outdoor unit and indoor units to the correct terminals
(1, 2, 3). Always attach each ground wire separately to a ground-
ing screw.
• After completion, secure wiring with wire clamps. Secure wiring
firmly to the indoor unit.
BD Unit Wiring Connection Procedure
1. Remove the BD unit control cover. Unscrew the two (2) screws, and slide the cover off the BD frame following the arrows in the diagram
(Step 1).
2. Draw the power wiring / communications cable through the field-supplied conduit so there is enough length to connect wiring / cable to the
terminals on the BD unit. Secure conduit to the BD unit using a field-supplied lock nut on the interior of the BD unit frame (Step 2).
3. Connect wiring / cable from the outdoor unit to the BD unit terminals, and from the BD unit terminals to the indoor unit terminals following
the wiring diagram on the outdoor unit control cover (Step 3). Allow 11-13/16 inches of slack in the wire harness. Attach wiring / cable to
the BD unit with clamps at four (4) locations.
4. Replace the BD unit control cover following the arrows in the diagram. Tighten the two (2) screws to finish (Step 4).
Figure 80: BD Unit Wiring Steps.
Step 1
death.
Always refer to the circuit diagram on the inside of the outdoor unit control cover.
58
Step 2
Conduit (field supplied)
Lock nut (field supplied)
Lock nut (field supply)
Due to our policy of continuous product innovation, some specifications may change without notification.
©LG Electronics U.S.A., Inc., Englewood Cliffs, NJ. All rights reserved. "LG" is a registered trademark of LG Corp.
Figure 79: Interior View of a BD Unit (Three-Port PMBD3630 Example
Shown).
"A" Room
"B" Room
"C" Room
Connection Wire to Indoor Units
Step 3
F
MULTI
F
MULTI
MAX
A
B
C
CN-PWR
Connection Wire from Outdoor Unit
Step 4
physical injury or

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents