Download Print this page

Advertisement

Quick Links

BENITO
–Play
Three
JPIN03
Instrucciones de montaje
Instructions de montage
Assembly instructions

Advertisement

loading
Need help?

Need help?

Do you have a question about the Three JPIN03 and is the answer not in the manual?

Questions and answers

Summary of Contents for BENITO Three JPIN03

  • Page 1 BENITO –Play Three JPIN03 Instrucciones de montaje Instructions de montage Assembly instructions...
  • Page 2 52,00 m² Safe area: 2000 1500 Aire de sécurité Altura max. caida: Maximum drop high: 1,20 m 1000 Hauter maximale de chute: Nº usuarios: Number of users: Nombre d'utilisateurs: Edad: Age: Age: 2 / 35 BENITO –Urban –Light –Play –Covers...
  • Page 3 5680 6900 3 / 35 BENITO –Urban –Light –Play –Covers...
  • Page 4 IMPORTANT: for installation and foundation of the game are necessary The playing surface must be covered by a floor to avoid the impact, according tools usually employed in the construction. to standard EN 1176-1:2017 4 / 35 BENITO –Urban –Light –Play –Covers...
  • Page 5 835,8 1100 1180 Agujero para poste Trou por le porteaux Hole for post 3,30m x 4 2,10m 1540 3,00m x 4 3,00m x 4 5 / 35 BENITO –Urban –Light –Play –Covers...
  • Page 6 Inserte el hardware correspondiente y apriételo. Confirm the location of post foot plate, as shown in the diagram. Align the post foot plate connect holes with each of the posts. Insert corresponding hardware and tighten. 6 / 35 BENITO –Urban –Light –Play –Covers...
  • Page 7 Inserte el hardware correspondiente y apriételo. Confirm the location of square deck, as shown in the diagram. Align the square deck holes with the holes on the posts. DIN125 M10 Insert corresponding hardware and tighten. 7 / 35 BENITO –Urban –Light –Play –Covers...
  • Page 8 Confirm the location of suspension bridge exit rail, as shown in the diagram. Align the suspension bridge exit rail connect part with corresponding holes on the posts and the deck. Insert corresponding hardware and tighten. 8 / 35 BENITO –Urban –Light –Play –Covers...
  • Page 9 Inserte el hardware correspondiente y apriételo. Confirm the location of suspension bridge handrail, as shown in the diagram. Align the suspension bridge handrail connector with corresponding holes on the exit rail. Insert corresponding hardware and tighten. 9 / 35 BENITO –Urban –Light –Play –Covers...
  • Page 10 Inserte el hardware correspondiente y apriételo. Confirm the crawl tunnel exit connect location, as shown in the diagram. Align the crawl tunnel exit connect holes with the post. Insert corresponding hardware and tighten. 10 / 35 BENITO –Urban –Light –Play –Covers...
  • Page 11 Inserte el hardware correspondiente y apriételo. Confirm the location PE stair arch door, as shown in the diagram. Align the PE stair arch door connect hole with the posts and the deck. Insert corresponding hardware and tighten. 11 / 35 BENITO –Urban –Light –Play –Covers...
  • Page 12 Confirm the location of 3’ stair, as shown in the diagram. Align the stair handrail with the posts, and align the bottom connect place on the stair with the deck. Insert corresponding hardware and tighten. 12 / 35 BENITO –Urban –Light –Play –Covers...
  • Page 13 Inserte el hardware correspondiente y apriételo. DIN7980 M10 Confirm the location of PE exit, as shown in the diagram. Align the PE exit connect hole with the posts. Insert corresponding hardware and tighten. 13 / 35 BENITO –Urban –Light –Play –Covers...
  • Page 14 Confirm the location of PE ABC climber, as shown in the diagram. Align the hole on the top of PE ABC climber with corresponding holes on the deck. Insert corresponding hardware and tighten. 14 / 35 BENITO –Urban –Light –Play –Covers...
  • Page 15 DIN7980 M8 Donut Confirm the location of PE climber guardrail, as shown in the diagram. Align the PE climber guardrail connect hole with corresponding holes on the posts. Insert corresponding hardware and tighten. 15 / 35 BENITO –Urban –Light –Play –Covers...
  • Page 16 Inserte el hardware correspondiente y apriételo. Confirm the location of 4’ PE climber, as shown in the diagram. Align the 4’ PE climber connect hole with corresponding holes on the posts. Insert corresponding hardware and tighten. 16 / 35 BENITO –Urban –Light –Play –Covers...
  • Page 17 Inserte el hardware correspondiente y apriételo. Confirm the location of PE top handrail, as shown in the diagram. Align the PE top handrail with corresponding holes with the posts. Insert corresponding hardware and tighten. 17 / 35 BENITO –Urban –Light –Play –Covers...
  • Page 18 M10x25 Confirm the location of PE 3’ stair handrail, as shown in the diagram. Align the PE 3’ stair handrail connect hole with corresponding holes on posts. Insert corresponding hardware and tighten. 18 / 35 BENITO –Urban –Light –Play –Covers...
  • Page 19 Inserte el hardware correspondiente y apriételo. DIN125 M10 M10x25 Confirm the location of PE staire guardrail, as shown in the diagram. Align the PE stair guardrail with corresponding holes on the panel. Insert corresponding hardware and tighten. 19 / 35 BENITO –Urban –Light –Play –Covers...
  • Page 20 Inserte el hardware correspondiente y apriételo. Confirm the location of PE stair guardrail, as shown in the diagram. Align the PE stair guardrail with corresponding holes on the posts. Insert corresponding hardware and tighten. 20 / 35 BENITO –Urban –Light –Play –Covers...
  • Page 21 Inserte el hardware correspondiente y apriételo. Tapon/cap/bouchon Donut Confirm the location of PE stair steps, as shown in the diagram. Align the steps with each of connect hole on the stair. Insert corresponding hardware and tighten. 21 / 35 BENITO –Urban –Light –Play –Covers...
  • Page 22 Inserte el hardware correspondiente y apriételo. M10x25 Confirm the PE clok panel location, as shown in the diagram. Align the PE clok panel connect holes with the posts. Insert corresponding hardware and tighten. 22 / 35 BENITO –Urban –Light –Play –Covers...
  • Page 23 Inserte el hardware correspondiente y apriételo. M10x25 Confirm the PE thermometer panel location, as shown in the diagram. Align the PE thermometer panel connect holes with the posts. Insert corresponding hardware and tighten. 23 / 35 BENITO –Urban –Light –Play –Covers...
  • Page 24 Inserte el hardware correspondiente y apriételo. M10x25 Confirm the PE music panel location, as shown in the diagram. Align the PE music panel connect holes with the posts. Insert corresponding hardware and tighten. 24 / 35 BENITO –Urban –Light –Play –Covers...
  • Page 25 Inserte el hardware correspondiente y apriételo. Confirm the PE spell panel location, as shown in the diagram. Align the PE spell panel holes with the posts. Insert corresponding hardware and tighten. 25 / 35 BENITO –Urban –Light –Play –Covers...
  • Page 26 Inserte el hardware correspondiente y apriételo Confirm the position of PE seat, as shown in the diagram. Align the connect hole on both sides of PE seat with each of the posts. Insert corresponding hardware and tighten. 26 / 35 BENITO –Urban –Light –Play –Covers...
  • Page 27 Inserte el hardware correspondiente y apriételo. Confirm the location of PE top handrail, as shown in the diagram. Align the PE top handrail with corresponding holes with the posts. Insert corresponding hardware and tighten. 27 / 35 BENITO –Urban –Light –Play –Covers...
  • Page 28 Inserte el hardware correspondiente y apriételo. Confirm the location of PE slide panel pipe, as shown in the diagram. Align the PE slide panel pipe connect hole with the posts. Insert corresponding hardware and tighten. 28 / 35 BENITO –Urban –Light –Play –Covers...
  • Page 29 Inserte el hardware correspondiente y apriételo. Confirm the location of PE slide rail, as shown in the diagram. Align the PE slide rail connect hole with the panel pipe connect hole. Insert corresponding hardware and tighten. 29 / 35 BENITO –Urban –Light –Play –Covers...
  • Page 30 Confirm the location of PE stianless slide, as shown in the diagram. Align the connect hole on the top of PE stainless slide with the corresponding holes on the deck. Insert corresponding hardware and tighten. 30 / 35 BENITO –Urban –Light –Play –Covers...
  • Page 31 Inserte el hardware correspondiente y apriételo. Confirm the location of PE slide rail, as shown in the diagram. Align the PE slide rail connect hole with corresponding holes on the stainless slide. Insert corresponding hardware and tighten. 31 / 35 BENITO –Urban –Light –Play –Covers...
  • Page 32 Inserte el hardware correspondiente y apriételo. Confirm the position of PE tree decoration, as shown in the diagram. Align the PE tree decoration connect holes with the posts. Insert corresponding hardware and tighten. 32 / 35 BENITO –Urban –Light –Play –Covers...
  • Page 33 Inserte el hardware correspondiente y apriételo. Confirm the position of PE butterfly decoration, as shown in the diagram. Align the PE butterfly decoration connect holes with the posts. Insert corresponding hardware and tighten. 33 / 35 BENITO –Urban –Light –Play –Covers...
  • Page 34 Inserte el hardware correspondiente y apriételo. Confirm the position of PE volcano gable roof, as shown in the diagram. Align the PE volcano gable roof connect holes with each of the posts. Insert corresponding hardware and tighten. 34 / 35 BENITO –Urban –Light –Play –Covers...
  • Page 35: Inspection Avant Utilisation

    6.-Vérifiez que les massifs de scellement sont assez profonds. BENITO URBAN se reserva el derecho de modificar sin previo aviso la información contenida en este documento. | BENITO URBAN se réserve le droit de modifier ses produits sans préavis les informations contenues dans le présent document.