Verify Device Functionality And Test Network Coverage - Cisco MR74 Hardware Installation Manual

Table of Contents

Advertisement

b. Screw the gland body into the threaded hole of the port. Use
an adjustable wrench to make sure the gland body is fully
seated in the hole.
c. Insert the split ring gasket into the gland body.
d. Screw the cap tightly onto the gland. You may need a
wrench to fully tighten the cap, but take care not to damage
the cable in the process.
Optional: Make the MR74 a gateway
1. Connect an active internet connection to the "IN" port of the PoE injector.
4.2.3.6 Attach Grounding Strap
Connect one end of grounding strap to grounding post with included screw
and washer. Securely attach the other end nearby metal structure.
Note on Outdoor Locations:
The equipment contains no operator access areas and is certified only for
installation, by trained personnel only.
The suitability of the mounting surface to hold the weight of the equipment
shall be evaluated in the installation instructions.
The equipment is intended for use in dry locations.
To protect the equipment in an outdoor location:
a. Ensure the conductive part of the equipment is connected to protective
earth to carry potential fault currents. This equipment is designed to
permit the connection of an 18AWG additional Green/Yellow earthed
conductor to earthing stud of a metal wall mount bracket of the equipment.
b. The equipment enclosure is IP67 rated
4.4 Verify Device Functionality and Test Network
Coverage
1. Check LEDs
The Radio Power LED should be solid white. If it is cycling
rainbow, the firmware is automatically upgrading and the LED
should turn white when the upgrade is completed (normally in under
thirty minutes).

Advertisement

Table of Contents
loading

Table of Contents