NEC PX1005QL-W User Manual page 175

Hide thumbs Also See for PX1005QL-W:
Table of Contents

Advertisement

Attaching Stacking Holders
Attach three stacking holders to three locations on the top of the lower projector.
Preparation:
Tools required are Phillips screwdriver (plus-head) and four stacking holders packaged with the projector.
Loosen the tilt foot (four locations) of the projector.
1. Remove rubber caps and screws at four locations.
(1) U se your tweezers or nail to pinch and pull up the rubber cap.
(2) R emove the screw from a square hole.
(1)
2. Attach the three stacking holders at four locations.
(1) P lace a stacking holder in a square hole.
(2) U se the screw removed at Step 1 to fix the stacking holder in the square hole.
(3) P ut the rubber cap removed at Step 1 back into the square hole.
• Snap the tabs on both of the rubber cap into the slits on both sides in the square hole.
(1)
(2)
(2)
(3)
6. Installation and Connections
158

Advertisement

Table of Contents
loading

This manual is also suitable for:

Px1005ql-b

Table of Contents