Samsung AR MRFQ Series User's Manual & Installation Manual page 33

Table of Contents

Advertisement

Left
<Possible directions of the pipe bundle>
CAUTION
• If changing the pipe direction from left to right, do not
drastically bent it but slowly turn it in the opposite
direction as shown. Otherwise, the pipe may be
damaged in the process.
<Minimum distances between the hole and
the installation plate>
Model
18/24
18
24
09/12/18 Pipe bundle hole : Ø 65mm
24 Pipe bundle hole : Ø 90mm
RAC MEDIA ODM 아프리카향 IBIM_EN_DB68-00000A-00.indb 33
Right
Rear right or left
Bottom right
(Unit : mm)
A
B
C
D
52
144
69
50
49
51
77
49
52
51
79
52
Drill the hole.
2
CAUTION
• Be sure to drill only one hole.
• Make sure that the hole slants downwards so that the
drain hose slants downwards to drain water well.
Indoor unit
<The hole slants downwards>
Step 1.4 Taping the pipes, cables, and
drain hose
Wrap foam insulation on parts without insulation on
1
the ends of the refrigerant pipes, as shown in the
figure. This wrapping minimises condensation problem.
Insulation
Refrigerant pipes
2
Wind the refrigerant pipes, power cable,
communication cable and drain hose with vinyl tape to
make a pipe bundle.
Installation plate
Vinyl tape
Power and communication cables
(assembly cable)
Drain hose
Wall
Drain hose
Refrigerant pipes
(assembly pipe)
English
33
2017-01-20 오전 11:28:40

Advertisement

Table of Contents
loading

Table of Contents