Outdoor Unit - Panasonic CS-A18JKD Service Manual

Table of Contents

Advertisement

11.4. Outdoor Unit

11.4.1. Install The Outdoor Unit
• After selecting the best location, start installation according to Indoor/Outdoor Unit Installation Diagram.
1. Fix the unit on concrete or rigid frame firmly and
horizontally by bolt nut (ø10 mm).
2. When installing at roof, please consider strong wind and earthquake. Please fasten the installation stand firmly with bolt or
nails.
11.4.2. Connecting The Piping
Connecting The Piping To Indoor Unit
Please make flare after inserting flare nut (locate at joint portion
of tube assembly) onto the copper pipe. (In case of using long
piping)
Connect the piping
• Align the center of piping and sufficiently tighten the flare nut
with fingers.
• Further tighten the flare nut with torque wrench in specified
torque as stated in the table.
Connecting The Piping To Outdoor Unit
Decide piping length and then cut by using pipe cutter. Remove
burrs from cut edge.
Make flare after inserting the flare nut (locate at valve) onto the
copper pipe.
Align center of piping to valves and then tighten with torque
wrench to the specified torque as stated in the table.
Model
A7JKD, A9JKD
474 mm
A12JKD
570 mm
A18JKD, PA18JKD,
A24JKD, PA24JKD,
612.5 mm
A28JKD
Piping size
1/4" [6.35 mm]
3/8" (9.52 mm)
1/2" (12.7 mm)
5/8" (15.88 mm)
3/4" (19.05 mm)
Do not over tighten, over tightening cause gas leakage.
23
A
B
C
87 mm
18.5 mm
105 mm
18.5 mm
131 mm
19 mm
Torque
[18 N•m (1.8 kgf.m)]
[42 N•m (4.3 kgf.m)]
[55 N•m (5.6 kgf.m)]
[65 N•m (6.6 kgf.m)]
[100 N•m (10.2 kgf.m)]
D
261 mm
320 mm
383 mm

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cu-a18jkdCs-a24jkdCu-a24jkd

Table of Contents