Startup - Hoshizaki KM-1601MRJ Instruction Manual

Modular crescent cuber
Table of Contents

Advertisement

I. Startup
All parts are factory-adjusted. Improper adjustments may adversely affect safety,
performance, component life, and warranty coverage.
• If the icemaker is turned off, wait for at least 3 minutes before restarting the
icemaker to prevent damage to the compressor.
• To prevent damage to the water pump seal, do not leave the control switch in the
"WASH" position for extended periods when the water tank is empty.
• At startup, confirm that all internal and external connections are free of leaks.
Additional Notice for Remote Models
• The icemaker must have power for a minimum of 4 hours prior to startup to
prevent compressor damage.
1) Open the water supply line shut-off valve(s).
2) Remove the front panel.
3) Move the control switch on the control box to the "ICE" position.
4) Replace the front panel in its correct position.
5) Turn on the power supply and allow the icemaker to operate for a total of 10 minutes.
6) After 10 min. of operation, turn off the power supply, then remove the front panel and the
insulation panel.
7) Slide the cube guide to the right, then remove the rubber cap and sleeve covering the
overflow pipe. See Fig. 20. Unscrew the overflow pipe. After the water tank has drained,
reconnect the overflow pipe. Replace the rubber cap, sleeve, and cube guide in their
correct positions. NOTICE! Make sure the O-ring is attached to the bottom of the
overflow pipe and be careful not to cross thread the overflow pipe.
8) Replace the insulation panel and the front panel in their correct positions.
9) Clean the dispenser unit/ice storage bin liner using a neutral cleaner. Rinse thoroughly
after cleaning.
10) Turn on the power supply to start the automatic icemaking process.
11) During the first 5 minutes of the freeze cycle, confirm
bin control operation by pressing and holding the bin
control's actuator paddle until the icemaker shuts down.
The icemaker should shut down in approximately
15 seconds.
12) On water-cooled models, confirm proper condenser
drain outlet/return outlet temperature as outlined in
"II.F.2. Water-Cooled Condenser."
13) Return to "II.H.2. Post-Startup" and complete final checklist.
WARNING
NOTICE
34
Cube Guide
Rubber Cap
Sleeve
Overflow Pipe
O-Ring
Fig. 20

Advertisement

Table of Contents
loading

Table of Contents