Mount The Unit; Install Ductwork - Viking Range VIPR102R Manual

Hide thumbs Also See for VIPR102R:
Table of Contents

Advertisement

Available languages

Available languages

VIKING RANGE CORPORATION

MOUNT THE UNIT

All Units
1. Set downdraft into opening. Extend leveling brackets to floor
of cabinet so downdraft sits straight. (Note: Leveling brackets
can be removed and re-attached in other positions. Bottom
flange may have to face inward in tight cabinet installations.)
2. Secure the downdraft to the countertop as follows: Hold the
downdraft against the back of countertop cut-out and tighten-
ing the two mounting screws (one on each end of unit) on
underside of countertop. Use a wood shim between screw
and underside of granite countertops.
3. Screw leveling brackets to bottom of cabinet. Tighten screws
holding leveling bracket to unit on each side.

INSTALL DUCTWORK

Interior Blower Installation
 BLOWER 
COLLAR
SCREWS
1. Cut hole in cabinet as well as holes in wall or floor as necessary.
2. Mount the roof or wall cap and work back towards the cabinet,
attaching all ductwork, elbows and transitions as previously
planned. Tape all ductwork connections to make them secure
and air tight.
3. Connect ductwork (and transition, if required) to downdraft.
If necessary, LOOSEN nuts and screws that hold the blower
in place, and slide blower left or right to meet ductwork.
Re-tighten screws and nuts.
Note: A 3-1/4" x 10" collar is provided for installers who prefer to
rivet the ductwork to the unit. This will allow blower to be removed and
replaced easily in service situations without disturbing ductwork.
All manuals and user guides at all-guides.com
!
CAUTION:
BEFORE CUTTING HOLE IN
CABINET FOR DUCTWORK,
check for interference with floor
joists, wall studs, electrical
wiring, or plumbing.
3-1/4" X 10"
TO 6" RD.
TRANSITION
6" RD. ELBOW
& DUCTWORK
7
MOUNTING SCREWS
LEVELING BRACKET -
FLANGE FACING OUT
LEVELING BRACKET -
FLANGE FACING IN
Exterior Blower Installation
ELBOW
10" ROUND DUCT
1. Cut hole in cabinet as well as holes in wall or floor as necessary.
2. Mount the exterior blower and work back towards the cabinet,
attaching all ductwork, elbows and transitions as previously
planned. Tape all ductwork connections to make them secure
and air tight.
3. Connect ductwork to downdraft. If necessary, LOOSEN nuts
and screws that hold remote blower adapter plate in place,
and slide outlet assembly left or right to meet ductwork.
Re-tighten screws and nuts.
Downdraft Ventilators
ELBOW

Advertisement

Table of Contents
loading

This manual is also suitable for:

Vipr102Vipr162Vipr162rVipr182Vipr182rVipr101rss

Table of Contents