Parts Description; Installation - Oceanic Stauna Controller Assembly And Operating Manual

Table of Contents

Advertisement

Stauna Manual
7.4.

Parts Description

13
12
1
2
7.5.

Installation

i.
Position the steam generator adjacent to the sauna heater on the wall of the cabin as shown in
the diagram on the next page.
ii. Fix to cabin wall using 40mm Screws and the locating fixing points on the back of the generator.
iii. Securing screws must be fixed through a whole in the brackets at the bottom rear to prevent
the unit being lifted off.
iv. Connect the steam generator to the stauna control box (see pages 4, 9, 13)
Oceanic Saunas 01902 450 550 sales@oceanic-saunas.co.uk www.oceanic-saunas.co.uk
11
10
14
3
4 5
6 7 8 9
S a u n a & S t e a m
No
Description
1
Back cover
2
Circuit board
3
Side cover
4
Terminal
5
Power entry
6
Heat element
7
Overheat switch
8
Water level indicator LED
9
Control panel
10
SUS tank
 
11
Water level probe
12
Steam outlet and water inlet
13
Shell
14
Heat preservation cotton
Fixing points
for 40mm screw
10

Advertisement

Table of Contents
loading

This manual is also suitable for:

Saunarium d2035

Table of Contents