Download Print this page

Kohler Numi+ K-3900T-2-0 Installation Manual page 9

Intelligent toilet

Advertisement

Fig. #1
Connector
Harness
Fig. #3
Install the Remote Dock
NOTE: The docking station comes with a 16'(5M) cord. Locate the docking station to allow the docking
cord to reach the toilet.
Unpack the box containing the remote control components.
Remove the small screw on the bottom of the docking station.
Carefully remove the cover plate by plug the tool into the gap on the top of the back, gently prying the sides
of the cover plate out until they disconnect from the dock. (see Fig. #2)
Carefully disconnect the cover plate plug.
Set the cover plate aside.
For installations using the concealed type, route the power cord through the back cord opening.
For installations using the out-loading type, route the power cord through the bottom cord
opening.
Position the docking station in the installation position and mark the screw locations using the dock
as a template.
Drill appropriate size mounting holes at the screw mounting locations. The size of the hole will
depend on the need for wall anchors, wall material, and installation requirements.
Loosen each of the five small screws located where the wires will be connected.
Run the power cord into the docking station through the back cord opening in concealed type or the bottom
cord opening in out-loading type.
Position the docking station over the installation location, connect the docking station to the wall using two
screws.
Cut the tin(about 2mm) of the bare end of the wire.
Kohler Co.
Screw
Orange
Blue
Red
White
Black
Docking Cord
Holes
Disconnect.
Fig. #2
Back Cord
Opening
Bottom Cord
Opening
Fig. #4
9
Gap on the top of the back
Back Cord
Opening
1195109-T01-F

Advertisement

loading

This manual is also suitable for:

Numi k-3900t-2