Case 2050M Tier 4A interim Service Manual page 39

Crawler dozer
Hide thumbs Also See for 2050M Tier 4A interim:
Table of Contents

Advertisement

Returning the unit to service
1. Disconnect the hand pump from the brake lines.
2. Remove the plugs, and reconnect the lines (1) to the
brake solenoid.
3. Remove the vacuum pump and install the hydraulic
reservoir breather.
4. Turn the engagement screws clockwise two turns on
each relief valve.
INTRODUCTION
47907871 20/10/2015
33
18
RAPH12DOZ0094AA
19
RAIL12DOZ0372AA
20
RCIL10CWL116AAL

Advertisement

Table of Contents
loading

Table of Contents