Buffer switch mode power supply unit with technical outputs (10 pages)
Summary of Contents for Pulsar HPSB 20A12C
Page 1
HPSB 20A12C v.1.0 HPSB 13,8V/20A/17Ah Buffer switch power supply unit. EN** Edition: 2 from 24.10.2016 Supercedes the edition: 1 from 04.03.2016...
GREEN POWER www.pulsar.pl HPSB20A12C Features: DC 13,8V/20A uninterruptible power supply* battery output full protection against short-circuit and reverse polarity connection fitting battery: 17Ah/12V wide range of mains supply: 176÷264V LED indication protections: built-in power factor correction system (PFC) ...
GREEN POWER www.pulsar.pl HPSB20A12C Fig.1. The block diagram of the PSU. 1.3 Description of PSU components and connectors. Table 1. Elements of the PSU. Element no. Description [Fig. 2] PSU module Connectors PSU: L-N power supply connector 230V AC, Protection connector PE...
Page 4
GREEN POWER www.pulsar.pl HPSB20A12C Fig.2. The view of the PSU.
GREEN POWER www.pulsar.pl HPSB20A12C 1.4 Specifications: - electrical parameters (tab.2) - mechanical parameters (tab.3) - operation safety (tab.4) - operating parameters (tab.5) Table 2. Electrical parameters. PSU type A (EPS - External Power Source) 176÷264V AC 50Hz Mains supply Current up to 1,5A@230VAC max.
GREEN POWER www.pulsar.pl HPSB20A12C Table 4. Operation safety Protection class PN-EN 60950-1:2007 I (first) Protection grade PN-EN 60529: 2002 (U) IP20 Electrical strength of insulation: - between input and output circuits of the PSU (I/P-O/P) 3000 V/AC min. - between input circuit and PE protection circuit (I/P-FG) 1500 V/AC min.
Page 7
GREEN POWER www.pulsar.pl HPSB20A12C 2.2 Installation procedure. 1. Before installation, cut off the voltage in the 230V power-supply circuit. 2. Mount the PSU in a selected location and connect the wires. 3. Connect the power cables (~230Vac) to L-N clips of the PSU. Connect the ground wire to the clip marked by the earth symbol PE (PSU module connector).
Page 8
CAUTION! The power supply unit is adapted for cooperation with the sealed lead-acid batteries (SLA). After the operation period they must not be thrown but recycled according to the applicable law. Pulsar Siedlec 150, 32-744 Łapczyca, Poland Tel. (+48) 14-610-19-40, Fax. (+48) 14-610-19-50 E-mail: biuro@pulsar.pl, sales@pulsar.pl http:// www.pulsar.pl, www.zasilacze.pl...
Need help?
Do you have a question about the HPSB 20A12C and is the answer not in the manual?
Questions and answers