Download Print this page

Sharp VC-H965U Service Manual page 21

Hide thumbs Also See for VC-H965U:

Advertisement

4-22 INSTALLING THE SHIFTER
Capstan D.D.
motor
(Bottom side of mechanism chassis)
Figure 4-36.
b
Loading arm (T)
Shifter
*Not run on the
sifter.
Sifter
Tension arm
1. Make sure that the loading arm T and S are at the Phase-
2. Fix the shifter position setting part to the roading arm T
Drum
3. Make sure tension arm not run on the shifter as shown
Insert point
c
Figure 4-37.
21
Matching point as shown below
position setting part as shown in figure
in figure
c
.
Loading arm (T)
Phase matting
VC-A565U/H965U
SUPPLEMENT
a
.
b
.
a
Loading arm (S)

Advertisement

loading

This manual is also suitable for:

Vc-a565u