Panasonic CS-XZ20XKEW-H Service Manual page 55

Table of Contents

Advertisement

12.4.8
Proper Pump Down Method
1
Operate air
conditioner at
cooling mode for
10 ~ 15 minutes.
Most Important Process
Purpose: To make the oil
& refrigerant mix together.
They are in separated
condition when
air conditioner
is stopped.
2
After 10 ~ 15 minutes of pre
operation, close 2 way valve.
After 3 minutes, close 3 way
valve.
Mixed refrigerant &
oil will be collected
into outdoor unit.
55
3
4
Take out air
conditioner unit.
Only very small
amount of oil remain
inside piping, which
is acceptable.
Install New
Refrigerant air
conditioner.

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cs-xz25xkew-hCs-xz35xkew-hCu-z20xkeCu-z25xkeCu-z35xke

Table of Contents