Boiler With Low Water Cut-Off; Boiler With Low Water Cut-Off (Remote-Mounted Field Supplied); Venting Connection - Viessmann B2HB009 Installation Instructions Manual

Hide thumbs Also See for B2HB009:
Table of Contents

Advertisement

Boiler Connections

Boiler with Low Water Cut-off

Automatic
air vent

Venting Connection

CAUTION
Under certain climatic conditions some building materials
may be affected by flue products expelled in close
proximity to unprotected surfaces. Sealing or shielding
of the exposed surfaces with a corrosion resistant
material (e.g. aluminum sheeting) may be required to
prevent staining or deterioration. The protective material
should be attached and sealed (if necessary) to the
building before attaching the vent termination. It is
strongly recommended to install the vent termination
on the leeward side of the building.
44
Vitodens 200-W B2HB 19 to 35, 68 to 125 Installation
Boiler with low water cut-off (remote-mounted,
field supplied)
Automatic
air vent
A low water cut-off may be required by local codes. Do
not install an isolation valve between boiler and low water
cut-off.
For low water cut-off wiring information specific to your
application, refer to applicable wiring diagram (see page 45).
Follow the installation instructions of the
low water cut-off from the manufacturer.
Vitodens 200-W, B2HB Installation
Instructions Venting System

Advertisement

Table of Contents
loading

Table of Contents