Bolting & Clamp Information - LG N2T-J5 Series Installation Manual

Pv solar module
Table of Contents

Advertisement

※ Only Tracker
Note) When installed Fig.7, follow the tracker manufacturer's recommended applied torque and materials to fasten
the modules.
Bolting Method
• Four M8(5/16inch) stainless steel bolts, four nuts, four spring washers, and eight flat washers are recommended
per solar module.
Clamp system requirements
• The clamp should not be touched with the module's glass.
• Use corrosion resistant material clamps and hardware.
→ If you use a special clamp, it needs to test for compatibility by LGE.
• Use appropriate bolted connections as per clamp manufacturer's instructions.
• Follow the clamp manufacturer's recommended applied torque to fasten the clamps.
Note) All mechanical installation methods(Fig.1 to Fig.7) and bolting method in this appendix were not tested by VDE.
It is evaluated by LG internal test.
14
① : 812mm
Fig7. Bolting Type
Module frame
Bolt
Flat washer
Mounting Rail
Flat washer
Spring washer
Nut
Front : 2000Pa
Rear : 1750Pa
Width
Height
<Middle Clamp>
Width
Depth
<Edge Clamp>
Depth
Height