External Structure; Mounting; Package Verification; Installation Preparation - Alpha ESS SMILE-EVCT11 Installation & Operation Manual

Table of Contents

Advertisement

INTRODUCTION

1.4 External Structure

180mm
38mm
87mm
03
04
02

Mounting

2.1 Package Verification

Unpack to check and verify following items after receiving the charger:
• Visual inspection on external appearance. In case there is any broken or damage,
notify the seller immediately.
• Check accessory type and quantity. If there is quantity in short or type inconformity,
make the record in time and contact the seller at once.

2.2 Installation Preparation

2.2.1 Tools
Tool Name
Multimeter
Cross Screwdriver
(PH2x150mm, PH3x250mm)
Insulated Torque Wrench
Electric drill
Diagonal Pliers
2.2.2 Cables & Materials
Name
Power supply cable
Communication cable
Photo
Function
Check electrical connection and
electri-cal parameter
Tight the screws
Tight the bolts
Hole on the wall
Cut cables
Specification
5*6mm² three-phase
Depend on actual requirement
power sup-ply cable
RJ45
Depend on actual requirement
MOUNTING
Quantity

Advertisement

Table of Contents
loading

Table of Contents