Advertisement

Quick Links

@AlphaEnergyStorageSystem
@AlphaESS
Alpha ESS Co., Ltd.
+86 513 806 068 91
info@alpha-ess.com
www.alpha-ess.com
JiuHua Road 888, High-Tech Industrial Development
Zone 226300 Nantong City, Jiangsu Province
Alpha ESS Europe GmbH
+
49 610 3459 1601
europe@alpha-ess.de
www.alpha-ess.de
Paul-Ehrlich-Straße 1a 63225 Langen
Alpha ESS Australia Pty. Ltd.
+61 1300 968 933
australia@alpha-ess.com
www.alpha-ess.com.au
Unit 1, 2 Ralph Street Alexandria NSW 2015
Alpha ESS UK Co., Ltd
uk@alpha-ess.com
Drake House, Long Street, Dursley, gl11 4hh
@alpha_ess
@AlphaESS
Alpha ESS Suzhou Co., Ltd.
+86 512 6828 7609
info@alpha-ess.com
www.alpha-ess.com
Building 10-A, Canal Town Industrial Park, 99 Taihu E Rd,
Wuzhong District, Suzhou 215000
Alpha ESS Italy S.r.l.
+39 599 239 50
info@alpha-ess.it
www.alpha-ess.it
Via Loda,17-41013 Castelfranco Emilia(MO)
Alpha ESS Korea Co., Ltd
+82 64 721 2004
korea@alpha-ess.com
2F, 19-4, Nohyeong 11-gil, Jeju-si, Jeju-do,
Republic of Korea
INSTALLATION & OPERATION MANU-AL
INSTALLATIONMANUAL
EV CHARGER
ENERGYSTORAGESYSTEM(ESS)
SMILE-EVCT11
STORION-SMILE-T10(INDOOR)
V01

Advertisement

Table of Contents
loading

Summary of Contents for Alpha ESS SMILE-EVCT11

  • Page 1 ENERGYSTORAGESYSTEM(ESS) @AlphaEnergyStorageSystem @AlphaESS @alpha_ess @AlphaESS STORION-SMILE-T10(INDOOR) SMILE-EVCT11 Alpha ESS Co., Ltd. Alpha ESS Suzhou Co., Ltd. +86 513 806 068 91 +86 512 6828 7609 info@alpha-ess.com info@alpha-ess.com www.alpha-ess.com www.alpha-ess.com Building 10-A, Canal Town Industrial Park, 99 Taihu E Rd, JiuHua Road 888, High-Tech Industrial Development...
  • Page 2: Table Of Contents

    CONTENT Copyright Statement INTRODUCTION This manual is under the copyright of Alpha ESS Co., Ltd. with all rights reserved. Please keep the manual properly and operate in strict accordance with all safety and operating instructions 1.1 Safety and Warning in this manual. Please do not operate the system before read-ing through the manual.
  • Page 3: Introduction

    Check the scope of delivery for completeness and any externally visible damage. Contact your distributor if the scope of delivery is incomplete or damaged. 1.1 Safety and Warning SMILE-EVCT11 1)Keep the explosive or flammable materials, chemicals, vapors and other hazard objects away from the charger.
  • Page 4: External Structure

    INTRODUCTION MOUNTING 1.4 External Structure Mounting 2.1 Package Verification 180mm 38mm Unpack to check and verify following items after receiving the charger: • Visual inspection on external appearance. In case there is any broken or damage, notify the seller immediately. •...
  • Page 5: Ac Charger Mounting

    MOUNTING MOUNTING 2.3 AC Charger Mounting 3. Open the top cover of EV-charger, hang it on the 2x M4*32 mm self-tapping screws, lock it into the bottom M4*32 mm self-tapping screw and then cover the sealing cap; 2.3.1 Mounting the AC Charger 140mm 62mm 3-∅6...
  • Page 6: Electrical Connection

    ELECTRICAL CONNECTION ELECTRICAL CONNECTION Electrical Connection 3.1 Installation Notice GRID a) Electrical device should be installed, operated, serviced, and maintained only by qualified personnel. No responsibility is assumed by the manufacturer for any consequences arising out of the use of this device. A qualified person is one who has LOADS EV-Charger skills and knowledge related to the construction, installation and operation of electrical...
  • Page 7: Ac Wiring

    The communication between the EV Charger and EMS of the energy storage system is 1.Remove a length of 40mm of the cable jacket and strip the wire insulation to a length of 8~15mm. RS485. RJ45 PIN definition is as below: 40mm 8mm-15mm EV AC Charger – SMILE-EVCT11 Yellow/Green Blue RJ45 PIN4 PIN5 Gray...
  • Page 8 ELECTRICAL CONNECTION ELECTRICAL CONNECTION 3.5.2 Communication Connection between SMILE5-INV-OUTDOOR and 3.5.4 Communication Connection between SMILE-T10 and AC Charger AC Charger SMILE-T10 SMILE5-INV-OUTDOOR AC Charger SMILE5-INV-OUTDOOR RS485 PIN RS485 PIN AC Charger SMILE-T10 Communication Cable RS485 PIN RS485 PIN (Self made) Communication Cable (Self made) 3.5.3 Communication Connection between SMILE-B3 and AC Charger...
  • Page 9: System Configuration And Operation

    ELECTRICAL CONNECTION SYSTEM CONFIGURATION AND OPERATION 3.5.6 Communication Connection between SMILE-HV Series and AC System Configuration and Operation Charger 4.1 Configuration For combining the EV charger to the energy storage system, please ask the installer enter the serial number of the EV Charger on the server. SMILE-HV Series AC Charger SMILE-HV...
  • Page 10: Setup On Alphacloud And App

    SYSTEM CONFIGURATION AND OPERATION SYSTEM CONFIGURATION AND OPERATION 4.2 Setup on AlphaCloud and APP 4.2.1.1 Green Charge – Slow Charge After configuration, the end user can monitor and set up the EV charger on the AlphaCloud and APP. Grid EV-Charger Loads PV Panels Max.
  • Page 11 SYSTEM CONFIGURATION AND OPERATION SYSTEM CONFIGURATION AND OPERATION 4.2.1.4 Max. Power Charge The EV charging source is PV and batteries. If PV power is available, it will supply other loads firstly, then supply the EV charger and maximize the EV charging power, and then charge the batteries of the ESS. At last it will feed into the grid.
  • Page 12: Troubleshooting

    TROUBLESHOOTING TROUBLESHOOTING 5.2 Fault Code Troubleshooting Error Code Problems Possible Causes Solutions 5.1 IndicatorState 1. Check the input voltage from the backend. State Description LED Status AC input voltage Input over OverVolt 2. If the voltage is over 276Vac for a short time, may be too voltage high.
  • Page 13: Specification Parameter

    SPECIFICATION PARAMETER Specification Parameter Error Code Problems Possible Causes Solutions 1. Check if Communication cable connection is SMILE-EVCT11 Model correct and firm. Dimension (H x W x D) 325 x 181 x 87 mm Poor connec-tion Communication 2. Check whether the communication cable...