Reference Guide - Redline HD PowerSmoke Operation Manual

Table of Contents

Advertisement

REFERENCE GUIDE

1. Flow Control Knob (Variable)
Releases vapor / pressure into the system
Close flow control valve to lock out system for pressure
decay testing
2. System Pressure Gauge
Displays the back pressure of system under test
3. Flow Meter
Measures flow rate into system under test
4. Power Indicator
Green light indicates proper connection to
electrical power
5. Vapor Test Switch
Begins fifteen-minute vapor cycle. Red light indicates
vapor cycle. Push again to stop testing
6. Air Only Test Switch
Begins fifteen-minute air only cycle. Blue light indicates
air only cycle. Push again to stop testing
7. Reset Switch
Clears stored logic
8. Adjustable Pressure Regulator
Adjust test pressure from 2 to 20+ PSI (0.14 to 1.4+ BAR)
9. Test Pressure Gauge
Indicates test pressure set by regulator
10. Fluid Fill Port
Remove fluid fill plug to fill machine with OEM-
Approved Vapor Producing Fluid
11. Vapor Output Hose
12. Compressed Air Inlet
Replace coupler fitting if necessary. Female 1/4 in.
NPT fitting
13. 12 Volt DC Power Cables
14. International AC Power Inlet (110-240V)
15. Power Supply Selector Switch
AC-OFF-DC
16. Fuse Holder
2.5A 250V Fuse plus one spare fuse
2
FRONT VIEW
1
4
5
6
7
8
BACK VIEW
10
12
11
14
16
2
3
9
15
13

Advertisement

Table of Contents
loading

This manual is also suitable for:

95-0171

Table of Contents