Connecting
Fixed Interface Pair
Before delivery, two service interfaces with adjacent interface numbers form a Layer 2 interface pair (excluding WAN interfaces of
the NIP6305E, NIP6310E, and NIP6510E).
The interface pair is used to connect upstream and downstream devices in the in-line deployment whereas any interface of the
interface pair can be used in the off-line deployment. The following figure shows an example of such an interface pair.
1
3
5
7
0
2
4
6

Connecting Cables

GE0/0/1
PWR
SYS
USB
HA
WAN
CLOUD
RST
0
1
2
NIP6510E
Off-line deployment,
In-line deployment,
detecting network attacks
protecting the server farm
SN:xxxxxxxxxx
xxxxxxxxxx
SM
xxxxxxxxxx
MAC:
MAC
xxxxxxxxxx
The preceding figure uses the NIP6510E as an example to describe cabling.
1. Connect cables based on the selected deployment mode.
﹣ In-line deployment: Use the default interface pair to connect the upstream and downstream devices. The following uses the
GE0/0/6-GE0/0/7 interface pair as an example. The NIP is deployed in in-line mode to block intrusion traffic and protect the
intranet against attacks.
﹣ Off-line deployment: Use an independent interface to connect to the observing port of the switch on the primary link and
receive mirrored traffic from the switch. GE0/0/1 is used as an example. The NIP is deployed in off-line mode to record
intrusion event logs without blocking traffic.
2. Connect the WAN interface ( supported only by the NIP6305E, NIP6310E, and NIP6510E) or management interface to the
Internet to update the signature database.
Before delivery, only the management interface and WAN interface are Layer 3 interfaces. If interfaces excluding the
management and WAN interfaces are used to communicate with external devices, the interfaces must be switched to Layer 3
mode.
3. Connect the management PC to the management interface.
4. Connect the PGND cable and power cable. Then power on the device.
As device does not provide a power switch, it starts up immediately after receiving power. When the SYS indicator on the
panel is blinking (once every two seconds), the device is running and ready for configuration.
9
11
13
8
10
12
GE0/0/7
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
GE0/0/6
...
15
1
WAN1
...
14
0
WAN0
Update of the
signature databases
WAN0/0/1
20
21
22
23
16
17
18
19
20
21
22
23
0
1
0
1
10G
WAN
FAN-
023A-B
AC power cable
3
SSD
MGMT
CON
MEth0/0/0
Administrator
STAT

Advertisement

loading

This manual is also suitable for:

Nip6305eNip6310eNip6510eNip6550eNip6610eNip6620e