processor by purchasing a supported processor option.
The following processor option is supported with AMD Opteron LS21 for IBM BladeCenter.
Dual Core AMD Opteron Processor Model 2210 EE
Dual Core AMD Opteron Processor Model 2220
Dual Core AMD Opteron Processor Model 8214 HE
Dual Core AMD Opteron Processor Model 8220
Memory support
The following memory options are supported with AMD Opteron LS21 for IBM BladeCenter and
AMD Opteron LS41 for IBM BladeCenter:
1 GB (2 x 512 MB Kit) PC2-5300 CL5 ECC DDR2 SDRAM VLP RDIMM (39M5861) New AMD
Opteron Processor for IBM BladeCenter
2 GB (2 x 1 GB Kit) PC2-5300 CL5 ECC DDR2 SDRAM VLP RDIMM (39M5864)
4 GB (2 x 2 GB Kit) PC2-5300 CL5 ECC DDR2 SDRAM VLP RDIMM (39M5867)
8 GB (2 x 4 GB Kit) PC2-4200 CL4 ECC DDR2 SDRAM VLP RDIMM (39M5870) (when
available)
Power considerations
The BladeCenter enclosure contains two 2,000-watt 220 V ac power modules. These modules
must be attached to a supported high-voltage PDU. These standard power modules support
blade bays 1 through 6 with power redundancy. When adding additional blade servers in bays 7
through 14, a BladeCenter 2,000 watt power supply module must be installed. This option
provides both power and redundancy to these blade bays.
Cable orders: Each LS21 and LS41 for BladeCenter blade contains two Gigabit Ethernet
connections. An optional BladeCenter four-port Gigabit Ethernet Switch Module must be installed
in the BladeCenter to support additional Ethernet connections. This Ethernet switch contains four
ports with RJ-45 connectors. The RJ-45 connectors provide a 10/100/1000 Base-T interface
(either at half- or full-duplex) for connecting twisted-pair cable to the Ethernet network. Cabling is
not included with the server. To connect the Ethernet controller to a repeater or switch, use an
unshielded twisted pair (UTP) cable with RJ-45 connectors at both ends. For 100 Mbps, or
higher operation, Category 5 cabling must be used. For 10 Mbps operation, Category 3, or
better, cabling must be used.
Installations using the BladeCenter 2-port Fibre Channel Switch Module require short- or
long-wave small form factor pluggable (SFP) options and appropriate FC cabling.
Installability: Each LS21 or LS41 for BladeCenter requires approximately 10 minutes for
installation. Installation includes unpacking, setting up, and powering on the system. Additional
time is required to install an operating system, additional options, or features.
Packaging
LS21 for BladeCenter
Product
AMD Opteron LS21
for IBM BladeCenter
Model 21x
IBM United States Announcement 107-103
Package description
BladeCenter LS21 Carton
Contents:
AMD Opteron LS21 for IBM
BladeCenter
Publications/CD Package
Contents:
Installation and User's Guide
Documentation CD-ROM (softcopy of publications)
Broadcom CD-ROM
Safety flyer
IBM is a registered trademark of International Business Machines Corporation
40K1263
40K1264
40K1265
40K1266
Boxes
1
1
1
15

Advertisement

Table of Contents
loading

This manual is also suitable for:

Amd opteron ls41

Table of Contents