Bosch DRR16AQ20 User Manual And Installation Instructions page 18

Ceiling-mounted ventilation system
Hide thumbs Also See for DRR16AQ20:
Table of Contents

Advertisement

en Installation instructions
Install the appliance with a fixing material which is
3.
sufficiently stable and has been adjusted accord-
ingly for both the structural conditions and the
weight of the appliance.
Check the cut-out area for existing cables of other
4.
appliances.
Preparing the ceiling
Cover the hob to prevent damage.
1.
Determine the position of the appliance and,
2.
thereby, the centre based on the position of the
hob.
Ensure that there are no electrical wires, gas pipes
3.
or water pipes in the area where holes are to be
drilled.
Drill four holes with a diameter of 6 mm for the fix-
4.
ing.
Drill the hole depth in accordance with the length of
5.
the screws.
Screw the fastening screws into the ceiling.
6.
Screw in the threaded rods.
7.
Screw the nuts approx. 10 mm onto the threaded
8.
rods.
13
4
Preparing the appliance
Remove the grease filters.
1.
To avoid causing damage, do not bend the grease
filters.
18
Loosen the screws on the side covers.
2.
20
Open the odour filter cartridge.
3.
Push the side covers inwards and remove them.
4.
Close the odour filter cartridge.
5.
Hanging the appliance
Lift the appliance by the corners and turn it over.
1.
Position the cable that is provided on-site in the
2.
marked area on the appliance.

Advertisement

Table of Contents
loading

Table of Contents