Toro ProLine 139-7860 Installation Instructions Manual page 6

Commercial walk-behind mower
Table of Contents

Advertisement

5
Removing the Deflector
No Parts Required
Procedure
1.
Remove the cotter pin
Retain the pin for use in Step
Bagger onto the Machine (page
2.
Disengage the spring from the notch in the
deflector bracket and slide the rod out of the
welded deck brackets, spring, and discharge
deflector
(Figure
1. Rod
2. Cotter pin
3. Deflector
3.
Remove the discharge deflector.
(Figure
11).
4
in
6 Installing the
6).
11).
Figure 11
4. Spring
5. Deck brackets
6. Spring installed over the
rod
WARNING
An uncovered discharge opening could
allow the machine to throw objects at
you or bystanders and result in serious
injury. Also, contact with the blade could
occur.
Never operate the machine unless you
install a mulch plate, discharge deflector,
or grass collection system.
6
Installing the Bagger onto
the Machine
No Parts Required
Procedure
1.
Position the front and rear tab on the bagger
mounting bracket onto the machine as shown
in
Figure
2.
Install the spring onto the straight end of the rod.
3.
Position the spring on the rod as shown so that
the shorter spring end is coming from under the
rod before the bend and going over the rod as it
returns from the bend.
4.
Install the previously removed rod and
corresponding cotter pin; refer to
g190642
1. Mounting bracket front tab
2. Chute pin
5.
If you are installing the bagger for the first time
or are moving it to a machine of a different size,
move the bagger clamp to the appropriate hole
in the back plate for your machine size.
6
12.
Figure 12
3. Hairpin
4. Mounting bracket rear tab
Figure
12.
g314885

Advertisement

Table of Contents
loading

Table of Contents