Advertisement

Quick Links

Installation, Operation & Maintenance Manual
NOTICE: This product is to be used only as directed. Read entire manual before use. Do not use unless properly installed.
www.globalplasmasolutions.com

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the DM-2 and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for GPS DM-2

  • Page 1 Installation, Operation & Maintenance Manual ™ NOTICE: This product is to be used only as directed. Read entire manual before use. Do not use unless properly installed. www.globalplasmasolutions.com...
  • Page 2: What's Included

    4. Appropriate conduit and wiring as detailed below in step 3 Location For best results install the DM-2 as close to the conditioned space as possible. This will minimize losses throughout ductwork. NOTE: Use temperature - Maximum ambient temperature in which unit shall be used: 140°F/60°C.
  • Page 3: Installation

    GPS recommends the DM-2 is powered constantly and NOT switched with the system or blower. The DM-2 will self adjust to voltages from 24V to 240VAC. Output and performance will not be affected by choice of input voltage.
  • Page 4 GREEN WIRE (Ground) G For your convenience and flexibility of installation the DM-2 is supplied without an electrical conduit and wire. It has a hole sized for ½” trade size conduit fittings (1/2” NPT) and an internal strain relief clamp.
  • Page 5 Step 4. Cut Hole · Find an appropriate location for the DM-2 and cut a 4” hole. The DM-2 should not be installed in the underside of a duct surface Step 5. Mounting Ring · Insert the mounting ring in the 4” hole.
  • Page 6 Step 6. Attach Mounting Ring · Using the supplied fasteners attach the mounting ring to the duct. Step 7. Insert DM-2 · Turn the DM-2 counter clockwise from the final installation orientation and insert into the mounting ring.
  • Page 7 Step 8. · Rotate the DM-2 clockwise. · Turn until you hear and feel a “click”. This ensures the DM-2 is properly seated on the ring. click Pull back lightly on the device to ensure proper installation.
  • Page 8: Airflow Direction

    Air Flow Direction Ensure the device is oriented according to the air flow indicator on the DM-2. Vertical Duct Flow Horizontal Duct Flow For horizontal and vertical applications the DM-2 can be installed in one of two positions shown.
  • Page 9: Operation

    CAUTION! Never touch brushes while operating - shock may occur. Cleaning Cycle The DM-2 comes with a factory preset cleaning cycle designed to clean the emitters once every day. CAUTION! High Voltage. CAUTION! This product is suitable for mounting to duct of metallic construction only. Installation must be such that the structural integrity of the ducting is not compromised.
  • Page 10 www.globalplasmasolutions.com...

Table of Contents