4 Troubleshooting

Inspection of power source and connections

4.1 Inspection of power source and connections
In case that there is any abnormality in the activation of the chiller unit, first perform the following check.
No.
Check item
1
Is the power source breaker or the fuse broken?
Is the secondary voltage of the transformer
2
flowing out correctly?
3
Is there any loose wiring or miswiring?
90
SMGB0120 rev.0 - 11/2017
Inspection method
Examine the secondary voltage of the breaker and the passage of electric
current through the fuse with a tester.
Remove the connection of the secondary side of the transformer, and
measure the (AC) voltage with a tester. Confirm that the voltage shown on
the transformer is being output.
Internal transformer of the unit
White
230V
Red
5
3
P C N 2 A
( C P U   P CB )
White
2 3 0 V
Red
5
3
PC N239
and
PC N240
( I/O PC B )
White
2 30V
Red
5
3
PC N2 38
Confirm that there are is no looseness in the wiring connections with PCB,
etc., or that there are no mistakes in local wiring, using the electrical wiring
diagrams as a reference.
Plugs for connection of wiring of the sensors (each of them)
Plugs for connection of flat cable
Plugs for connection of transformer connection
Plugs for each connection of 230V circuit
T
1
Red
3 0. 0V
Red
Blue
At rated
1 5. 5V
load
Blue
Orange
1 6. 1V
Orange
Internal transformer of the unit
T
1
Red
3 0 . 0 V
Red
Blue
1 5 . 5 V
At rated
load
Blue
Orange
1 6 . 1 V
Orange
Green
Internal transformer of the unit
T
1
Red
20 .1V
At rated
load
Red