Download Print this page

Hi-Tech ZycoTherm User Manual page 4

Advertisement

4.) Connect supply hose (yellow) to material Tote using supplied connectors. The plastic male cam-
lock should be transferred from old tote to new tote when replacing the material totes.
5.) Remove Center Cap from top of material tote. Pull rubber plug, punch out center plastic piece
with #2 philips screwdriver and place rubber plug back. A reusable vented cap may also be
purchased and can help keep moisture out of the product.
6.) The pump must be primed prior to being put into service. This is to fill the hose with product
and to displace any air that may be in the lines. Attach the quick connect with ball valve on the
end of the red hose and place it just inside the tote. This is for initial priming only and needs
only to be done at install.
NOTE: these are NO FLOW quick disconnects. Without mating them together no flow will
occur and will likely result in pump damage.
After prime and calibrate, close the Tote lid and place Ball Valve onto the Injection site.
Prime and Calibrate
Page 3

Advertisement

loading

Related Products for Hi-Tech ZycoTherm