Download Print this page

Hi-Tech ZycoTherm User Manual page 2

Advertisement

Page 1
In-Line Blend Pump
Install & User Manual
Plan a suitable location for the pump and the ZycoTherm material tote. The In-Line Blend Pump should
be located within 15 feet of the injection site, the closer the better. Typical injection location of
material is in the AC strainer before the AC Pump. Because this is the suction side of the system this
alleviates any potential back pressures into the Blend Pump and causes the greatest amount of mix
time to properly blend into the AC. The separate control box should be placed inside the control
house.
The Blend Pump requires 120VAC on a 20amp circuit. It is recommended to hard wire the pump. In
addition to power, the pump also requires a cable run from the Control House to the pump location.
This cable is for communication, and CAT5 Ethernet cable is typical because it is easy to find. CAT5
cable not supplied with pump.

Advertisement

loading

Related Products for Hi-Tech ZycoTherm