Download Print this page
ShelterLogic ShelterCoat Round Manual

ShelterLogic ShelterCoat Round Manual

5'w x 12'h round

Advertisement

Available languages

Available languages

Quick Links

ShelterCoat
15 ' W x 12 ' H Round
TM
Custom Garage Program
/
+
-
18"
/
1
2 "
45 cm
Please read instructions COMPLETELY before assembly. This shelter MUST be securely anchored.
THIS IS A TEMPORARY STRUCTURE AND NOT RECOMMENDED AS A PERMANENT STRUCTURE.
Before you start: 3 or more individuals recommended for assembly.
Assembly time is dependent upon the length of your building.
Allow approximately 15 minutes for every foot in building length.
1-800-524-9970
Canada:
1-800-559-6175
150 Callender Road
Watertown, CT 06795
www.shelterlogic.com
4/8/21
Page 1
05_GP-BA-XXXXXXA-015XXX12_E0

Advertisement

loading
Need help?

Need help?

Do you have a question about the ShelterCoat Round and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for ShelterLogic ShelterCoat Round

  • Page 1 Before you start: 3 or more individuals recommended for assembly. Assembly time is dependent upon the length of your building. Allow approximately 15 minutes for every foot in building length. 1-800-524-9970 Canada: 1-800-559-6175 150 Callender Road Watertown, CT 06795 www.shelterlogic.com 4/8/21 Page 1 05_GP-BA-XXXXXXA-015XXX12_E0...
  • Page 2 árboles, excremento de animales/aves y nieve liviana. Asegúrese de ® and light snow. Please insure this ShelterLogic Corp. structure que esta estructura de ShelterLogic ® Corp. Esté debidamente fi jada al ® assurer que la structure du ShelterLogic Corp. est bien assemblée, que is properly anchored, the cover is kept tight and free of snow and suelo, que la cubierta se mantenga tirante y libre de nieve y escombros.
  • Page 3 Au moment de la réception, si ce produit ou tout élément associé est défectueux ou manquant, ShelterLogic Corp. réparera ou remplacera, à sa discrétion, le produit ou ®...
  • Page 4 ANCHOR GUIDE / GUIDE D’ANCRAGE GUÍA DEL ANCLA Tous les abris et tentes ShelterLogic viennent Los refugios, los toldos y los garajes de ShelterLogic shelters, canopies and garages avec une trousse d’ancrage d’« installation » de ShelterLogic vienen con un básico “instalar” el come with a basic “install”...
  • Page 5 15'W x 12'H Round Style Frame Assembly Please read and understand instructions completely before assembly. Lay out frame parts as shown. Top Rail Middle Ribs End Rib End Rib Cover Rails Wind Brace Side Rails Wind Brace ATTENTION: Assembly Mfg. Assembly Mfg.
  • Page 6 NOTE: FRAME EXTENSION KIT Your model may have more middle ribs than shown in the illustration on page 3. You will receive one extra rib for every extra 4 ft. of building length that you purchase. The basic frame assembly will remain the same. The cover will be the correct size for the length of the building you purchased.
  • Page 7 4. ASSEMBLE WIND BRACES Fig.4 00648 Assemble all of the wind braces as shown in Fig. 4. Securely fasten the joints with the 11179 11005 hardware indicated. 00690 5. CONNECT THE FRONT END RIB TO THE MIDDLE RIBS A. With help, move the front end rib into the desired staked area. B.
  • Page 8 9. Secure the cable with the clamps provided. If the ground is too hard, dig a hole with a shovel or post hole tool. Optional: Fill with cement. If you are anchoring in gravel, clay, or asphalt, ShelterLogic recommends the Easy Hook ™ Drive ®...
  • Page 9 10. DOOR AND SOLID END PANEL INSTALLATION A. Hold end panel at the top center with white inner surface facing inside of the shelter. Wrap the edges of the fabric panel around the end rib. B. Disconnect top rail (the horizontal pipes that run from front to back along the top) from the end rib. Pull the webbing (the black strap) below the cross rail.
  • Page 10 Fig.11C Fig.11D NOTE: CHECK THAT YOUR COVER IS CORRECTLY PLACED ON THE FRAME. The ShelterLogic logo should line up on the left front and ® right rear corners near the top rail. If the logo is not legible, the cover has not been put on the frame correctly.
  • Page 11 C. Slide cover rails (#11105) through fabric pockets at each leg and reattach with clamps to each leg. Repeat this on other side. Push down on cover rails to tighten cover, before tightening bolts completely. D. Check and tighten Ratchets and Cover Rails monthly to ensure the cover is tight. NOTE: The ShelterLogic logo should ®...
  • Page 12 Avant de commencer : Il faut 2 personnes ou plus pour le montage qui prend environ 3 heures. Le temps de montage dépend de la longueur de votre bâtiment. Veuillez prévoir environ 15 minutes pour chaque pied de longueur du bâtiment. 1-800-524-9970 Canada: 1-800-559-6175 150 Callender Road Watertown, CT 06795 www.shelterlogic.com Page 12 05_GP-BA-XXXXXXA-015XXX12_E0...
  • Page 13 Abri à toit rond, 4,6 m x 3,7 m - Assemblage de l'armature (larg.) (haut.) Veuillez lire et vous assurer de bien comprendre TOUTES les instructions avant d'entreprendre l'assemblage. Étalez les pièces de l'armature, comme le montre l'illustration. Tube supérieur Nervures Nervure centrales...
  • Page 14 REMARQUE: NÉCESSAIRE DE RALLONGE D'ARMATURE Votre abri peut comporter davantage de nervures centrales que l'illustration de la page 12. Vous recevez une nervure additionnelle pour chaque section supplémentaire de 1,2 m. L'assemblage de l'armature de base reste le même. La taille de la toile correspondra à la longueur de l'abri. 4,6 m 1.
  • Page 15 ASSEMBLEZ LES CONTREVENTEMENTS Fig.4 00648 Assemblez tous les contreventements comme le montre la fig. 4. Serrez bien tous 11179 11005 les joints avec les fixations illustrées. 00690 5. FIXEZ LA NERVURE AVANT AUX NERVURES CENTRALES A. Avec l'aide d'une autre personne, placez la nervure avant à l'emplacement piqueté. B.
  • Page 16 Si le sol est trop dur, creusez un trou à l’aide d’une pelle ou d’une bêche-tarière. Option : Remplissez le trou de ciment. Pour un ancrage dans le gravier, l’argile ou l’asphalte, ShelterLogic recommande d’utiliser les ® ancrages Easy Hook , soit un pour chaque pied de l’armature, afin d’obtenir une installation plus...
  • Page 17 10. INSTALLATION DES PANNEAUX DE PORTE ET DE BOUT A. Tenez le panneau en haut et au centre avec la partie blanche vers l’intérieur de l’abri. Entourer le bord de la toile autour de l’ossature et passez les tubes au travers de la fente déjà coupée dans la toile. B.
  • Page 18 REMARQUE: ASSUREZ-VOUS QUE LA TOILE EST PLACÉE CORRECTEMENT SUR L'ARMATURE. Fig.11D Le logo ShelterLogic doit être aligné avec les coins ® avant gauche et arrière droit près du rail supérieur. Si le logo n'est pas bien visible, la toile n'est pas placée correctement sur l'armature.
  • Page 19 Répétez cette étape de l'autre côté. Appuyez sur les rails de toile pour tendre la toile avant de serrer complètement les boulons. D. Vérifiez les cliquets et les rails de toile chaque mois pour vous assurer que la toile est bien tendue. REMARQUE: Le logo ShelterLogic ® doit être orienté comme le montre l’illustration ci-dessous.